![Falcon SG1.5K-1SC Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/falcon/sg1-5k-1sc/sg1-5k-1sc_user-manual_540242028.webp)
27
W
Output Voltage Adjustment (-3%, -2%, -1%, 0%, +1%, +2%, +3%)
4.3.2.6 Press the Previous Page
button to execute special functions. The
functions include buzzer ON (as shown in figure Q1), buzzer OFF (as
shown in figure Q2), self-test OFF (as shown in figure R1) or self-test ON
(as shown in figure R2). When set, the UPS will execute the battery test for
10 seconds.
Содержание SG1.5K-1SC
Страница 15: ...14 4 1 1 Installation Instructions Tower installation Rack Mount installation Step 1 Step 2 ...
Страница 16: ...15 Step 3 ...
Страница 23: ...22 J K L M ...