INSTALLATION
Check the appliance is electrically safe and gas sound when you have finished.
21
Checking the Parts:
You will need the following equipment to complete the
cooker installation satisfactorily:
•
Flexible gas hose.
•
Gas pressure tester/manometer.
•
Multimeter: For electrical checks.
You will also need the following tools:
1.
Electric drill
2.
Masonry drill bit (only required if fitting the cooker on a
stone or concrete floor)
3.
Wall plugs (only required if fitting the cooker on a stone
or concrete floor)
4.
Steel tape measure
5.
Cross head screwdriver
6.
Flat head screwdriver
7.
4 mm & 3 mm Allen keys
8.
Spirit level
9.
Pencil
10.
Adjustable spanner
11.
13 mm spanner or socket wrench
12.
Screws for fitting the restraining chain and stability
bracket
Pan supports
Wok cradle
ArtNo.000-0001 90 Pan supports
ArtNo.000-0009 Wok ring, cast
Griddle
Full capacity shelf
ArtNo.311-0043 - Griddle 09
ArtNo.326-0013 - Full capacity shelf
(Falcon)
Grill pan tray support
2 grill pans & trivets
ArtNo.326-0004 - Cradle shelf
ArtNo.331-0008 - 90SC
grill pan & trivet
3 energy saving shelves
4 ladder side supports
ArtNo.326-0002 - Energy saving shelf
ArtNo.320-0030
90SC ladder support
Divider
Plinth
ArtNo.281-0028 - Albertine divider
ArtNo.350-0008 - 90 SC plinth
Restraining chain & hook
Stability bracket
ArtNo.020-0021 - Restraining
chain & hook