29
4.3 P
RODIGY
2 E
NGINE
B
OOT
UP
At this point the system should be booting up and the following text should be seen on
the graphical interface.
1. Take note of the SCSI devices being found in case a problem is encountered.
2. If the Prodigy 2 Engine has been configured to be part of a network, check that the
Engine is attaching to the network. For further details on connecting to an Local Area
Network, please refer to the
Prodigy 2 Edit User Manual
Содержание Prodigy 2
Страница 27: ...27 Front Panel Power Switch Back Panel Power Switch Prodigy 2 Engine Back Panel Prodigy 2 Engine Front Panel...
Страница 46: ...46 APPENDIX CONNECTION SIGNAL SPECIFICATIONS A2 CONTROL REFERENCE PINOUTS Prodigy 2 Engine System I O Panel...
Страница 57: ...57 B2 S URROUND M ONITOR S CHEMATIC...
Страница 61: ...61 B3 6 M ONITOR B OX C ONNECTOR V IEW...
Страница 62: ...62 B3 7 EDAC PINOUT DIAGRAM Each EDAC can have up to 18 circuits numbered 1 to 18...
Страница 63: ...63 B4 MONITOR BOX EDAC CONNECTIONS...
Страница 64: ...64...
Страница 67: ...67 D1 DIMENSIONS D1 1 PRODIGY 2 ENGINE SURFACE AND MONITOR BOX 360mm 500mm 460mm...
Страница 69: ...69 D1 2 PRODIGY 2 ENGINE POWER REQUIREMENTS Input 85 275 VAC 49 63Hz 300VA 10A 110V 6 3A 240V...