14
1.8 S
TATIC
P
RECAUTIONS
Please take note that all Fairlight manufactured electronic modules are static sensitive and
should be handled under anti static conditions. When working on a system always ensure that
you have an anti static lead connected and that the system is connected to ground through an
earth lead.
Never work on the system while powered up unless you are authorized by Fairlight to do
so. As a matter of practice always touch the external chassis of the system before opening the
front panel or disconnecting cables. If cards are not handled under anti static procedures your
machine may sustain damage which could either cause a complete failure or may cause
intermittent crashes and subsequential system failure.
When handling cards please ensure that they are placed in anti static bags when not in the
system. For shipment purposes electronic modules should be placed in an anti static bag and
then suitably surrounded with loose packaging materials in a solid card board box.
Cards shipped to Fairlight without the correct anti static packaging will have their warranty
voided. If you have any enquiries on this matter please feel free to contact your local Fairlight
office or distributor.
1.9 E
NVIRONMENT
The system is designed to be operated in a clean air-conditioned environment. Generally,
an area comfortable for people ( 20°C - 21°C ) should be suitable. The rack mounted units and
disk drives, use fans for ventilation. Users may find it desirable to install these units away
from the operator/console location. Note that cable lengths, as detailed in
Section 2.5 -
External Cable Length Considerations
, should be taken into account when planning the
installation.
Make sure that the rack unit can access cool air through the opening on the front of the
Engine and expel warm air from the back. As with all computer systems, the system will
operate more reliably if static generating floor coverings are avoided.
Do not fit the Engine into a closed environment except where ducted air is forced through
the Rack. Do not run the Engine whilst it is on the ground as it will accumulate dust, which
may eventually cause a failure.
The Engine is normally installed in a suitable 19" rack which is at least 600 mm deep, or has
an open back section. It is recommended that external hard drives be mounted on a rack tray,
above or below the Engine, using the shortest possible cables to prevent SCSI bus corruption.
Please Avoid:
Fitting the Engine where air circulation will be restricted.
Installing the Engine close to heat sources.
Installing in dusty or damp area.
Installing in an area subject to vibration.
Installing in area with strong magnetic or electric fields
Содержание Prodigy 2
Страница 27: ...27 Front Panel Power Switch Back Panel Power Switch Prodigy 2 Engine Back Panel Prodigy 2 Engine Front Panel...
Страница 46: ...46 APPENDIX CONNECTION SIGNAL SPECIFICATIONS A2 CONTROL REFERENCE PINOUTS Prodigy 2 Engine System I O Panel...
Страница 57: ...57 B2 S URROUND M ONITOR S CHEMATIC...
Страница 61: ...61 B3 6 M ONITOR B OX C ONNECTOR V IEW...
Страница 62: ...62 B3 7 EDAC PINOUT DIAGRAM Each EDAC can have up to 18 circuits numbered 1 to 18...
Страница 63: ...63 B4 MONITOR BOX EDAC CONNECTIONS...
Страница 64: ...64...
Страница 67: ...67 D1 DIMENSIONS D1 1 PRODIGY 2 ENGINE SURFACE AND MONITOR BOX 360mm 500mm 460mm...
Страница 69: ...69 D1 2 PRODIGY 2 ENGINE POWER REQUIREMENTS Input 85 275 VAC 49 63Hz 300VA 10A 110V 6 3A 240V...