Fagor FDD24 Скачать руководство пользователя страница 16

BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL 

 

             

 
 
3.8 SHELVING INSTALLATION 
 

1. Hook shelf clips onto shelf pilasters 
 
2. Position all four shelf clips equal in distance from the floor for level 
shelves 
 
3. Wire shelves are oriented so that cross support bars are facing down 
 
4. Place shelves on shelf clips making sure all corners are seated 
properly 
 
4 OPERATION 
 
Verify thermostat is in the OFF position prior to connecting the unit to its 
power source. Failure to do so could lead to electrical failures. Keep in 
mind the evaporator fans and lights will still have power while the 
thermostat in the OFF position. Connect unit to power supply.  
 
Temperature controller (inside the cabinet) goes from 0 (OFF Position) 
to 7 (Coolest Position). Set control at position 5 for temperature 
average of 35ºF.  
For 23 models set control at position 3, for temperature average of 35ºF 
 
DEFROSTING  
 
 The unit will not require defrosting if the door is only opened for a 
minimum time. Defrosting should be done when the keg is changed. To 
do this unplug the unit and leave the door open for fifteen minutes. 
Defrost water will accumulate in a pan under the evaporator and will 
drain to a plastic container in the storage area under the beer keg shelf. 
 
Do not use a pick, knife, etc., to pry ice from evaporator as this could 
puncture evaporator or damage the finish.

 

 

 
 
5 TROUBLESHOOTING 

 

Sometimes, working failures are due to simple causes which can be 
solved by the user. Before asking for the help of a qualified technician, 
you have to do some verifications. These failures are not covered by 
the warranty: 
1. Refrigeration doesn´t work 
a. Check the unit is still connected to power supply. 
 
2. Refrigerator doesn’t reach temperature. 
a. Check the thermostat is not in OFF position. 
b. Check the thermostat is at position 5 or higher. 
c. Check the unit is not on defrost cycle. 
d. Check gasket is in good condition and door is sealed. 
e. Check fan is moving. Open the door press and hold door switch for     
verification. 
f.  Don’t put any food inside until unit is at temperature. 
g. Be sure castors or legs were installed. 
 
3. There is water under the refrigerator. 
a. Check the drain pipe is over the pan. 
b. Check cabinet is level. 
 

 
 
 
 
 
 
 
 
 
 
 

Содержание FDD24

Страница 1: ...FAGOR BAR EQUIPMENT SERVICE MANUAL...

Страница 2: ...ING AND INSPECTING 2 SPECIFICATIONS 2 1 DIMENSIONS 3 INSTALLATION 3 1 UNCRATING 3 2 CLEANING OF CABINET 3 3 LOCATION 3 3 DATA PLATE 3 4 ELECTRICAL CONNECTIONS 3 5 SHELVING INSTALLATION 4 PERATION 5 TR...

Страница 3: ...d on the delivering carrier s receipt In the event that the exterior is not damaged yet upon opening there is concealed damage to the equipment notify the carrier immediately Notification should be ma...

Страница 4: ...BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL 4 2 SPECIFICATIONS DIRECT DRAW...

Страница 5: ......

Страница 6: ...BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL 2 1 DIMENSIONS...

Страница 7: ...BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL...

Страница 8: ...BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL...

Страница 9: ...BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL BACK BAR MODELS...

Страница 10: ...BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL...

Страница 11: ...BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL...

Страница 12: ...exceed 20 feet in length The use of ungrounded cords or overloaded circuit voids compressor warranty 3 3 CLEANING OF CABINET The exterior of the cabinet is painted and should be cleaned only with luke...

Страница 13: ...plete and checked for leaks place the CO2 bottle in the rear inside of cabinet with the pressure gage visible for reading then place the keg in position allowing the door to be closed completely witho...

Страница 14: ...rtant to understand that when the keg of beer is purchased it must be installed inside the cooler as soon as possible to avoid excessive warm up of the beer If this happens it may take many hours for...

Страница 15: ...recommended that in the event the data plate is removed you copy down the essential information in this manual for reference before installation 3 7 ELECTRICAL CONNECTIONS Refer to the amperage data...

Страница 16: ...he keg is changed To do this unplug the unit and leave the door open for fifteen minutes Defrost water will accumulate in a pan under the evaporator and will drain to a plastic container in the storag...

Страница 17: ...l can be cleaned with a simple brush Heavier dust build up may require a vacuum or even compressed air to blow though the condenser coil If heavy grease is present there are de greasing agents availab...

Страница 18: ...enance Each unit has a drain located inside the unit which removes the condensation from the evaporator coil and evaporates it at an external condensate evaporator pan Each drain can become loose or d...

Страница 19: ...BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL 7 WIRING DIAGRAMS FDD23...

Страница 20: ...BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL FDD FBB 24 59 69 79 95 La Light No According to model...

Страница 21: ...1 1 1 1 1 1 602101M0020 Compressor NE6187Z 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 602101M0033 Start Kit for NE6160Z 602101M0035 Start Kit for NE6187Z 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1...

Страница 22: ...1 1 603107M0004 Glass Black Door Kit Abr 09 2 2 3 M16909M0007 Letf Lower Hinge Kit Abr 09 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 M16901M0044 Black Door Kit Abr 08 1 M16901M0048 SS Door Kit Abr...

Страница 23: ...Fan Evaporator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 602105M0015 Fan Evaporator 220V 6021050008 Fan Evaporator 220V 602105M0009 Fan Blade Evaporator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1...

Страница 24: ...1 1 1 1 M10913M0180 Bottom panel Jun 08 1 1 1 1 1 1 1 1 1 1 1 1 M10913M0211 Bottom panel Dic 09 1 1 1 1 1 1 1 1 1 1 1 1 M10913M0353 Bottom panel Dic 09 1 1 1 1 1 1 1 1 1 1 1 1 M10917M0099 Side Panel 1...

Страница 25: ...Rack w guides 95 Center 2 2 2 2 602701M0017 Rack Flat 79 Center 1 1 1 1 602701M0018 Rack w guides 79 Center 1 1 1 1 602701M0019 Rack Flat 79 Small LH 1 1 1 1 602701M0020 Rack w guides 79 Small LH 1 1...

Страница 26: ...2 7 Top FBB MBB 69 68 1 1 1 1 M18101M012 3 Top FBB MBB 59 58 1 1 1 1 Tower s Dispenser 604313M0003 Tower 1 Dispenser 1 1 1 1 1 1 604313M0004 Tower 2 Dispenser 1 1 2 1 1 2 M10901M019 5 Grid cover for d...

Страница 27: ...tal of 2 two hours or up to 100 miles total Any charges exceeding those stated herein or overtime rates must have prior authorization by Fagor Additional Four Year Compressor Part Warranty In addition...

Страница 28: ...ess for a particular purpose Proper Maintenance and Operation The Equipment must be properly maintained and operated in accordance with Fagor maintenance and operating procedures All service labor and...

Страница 29: ...BAR EQUIPAMENT OPERATIOS AND SERVICE MANUAL...

Отзывы: