109
LOAD DISTRIBUTION CONTROL
Install steps
BUILT-IN INSTALLATION
Appendix
Tool
Self-tapping screws
Hinges
Spacer
Counter magnet
Fixed position paper
Screw driver
Automatic driver
Ruler
Pencil
(M5*12)
(ST4*12)
(ST4.8*15)
x4
x6
x4
1
825mm
600mm
540mm
595mm
152.5mm
580mm
825mm