
UM-X
Page 9/35
4.2 Pin assignment
Wiring work must only be performed when the equipment is
disconnected from the power supply. The special VDE regulations and
the local installation regulations must be observed.
In doing so observe the maximum values for operating parameters
indicated on the wiring diagram.
Sensor connection
The sensor is connected to the terminals 1 (-) and 2 (+).
21
- +
1 2
18 19
20
22
Fig. 2: Measurement analyser UM-X: Pin assignment
(1) Keyboard connection
(2) Display connection
(3) Sensor
(4) Acknowledgement button
(5) Auxiliary power
Содержание UM-X
Страница 31: ...UM X Page 31 35 Appendix 1 EC declaration of conformity ...
Страница 32: ...UM X Page 32 35 2 EC type examination certificate ...
Страница 33: ...UM X Page 33 35 ...