Anti-terrorism retractable oil-hydraulic bollard

OPERATIONS FOR ORDINARY ROUTINE MAINTENANCE OF FADINI AUTOMATIC BOLLARDS (EVERY SIX MONTHS)

The standard maintenance routine sequence is as follows:
• Clean the ground cylinder and suck all material settlements.
• Clean water drains located at the bottom of the ground cylinder and/or excavation pit.
• Check any possible oil leaking from the hydraulic piston and, in case,  x it.
• Overhaul the screws fastening the bollard to the ground cylinder, making sure they are properly tightened and lubricated.
• Check the oil-hydraulic motor-pump and oil pressure by assessing the rising times of the bollard. If required, top up oil in the 
reservoir and/or parallel add an extra capacitor to the existing one (instructions manual is to be referred to).
• Check the correct functioning of the signal LED lights (if incorporated) in the bollard head.
• Sight check the electronic board controlling the bollard/s (e.g.: “ ooded” relay contacts, oxidized terminal clamps, etc.).
• Check the correct functioning and positioning of the limit switches.
• Check the release system for bollard manual operations.
• Clean and recondition the rising cylinder if required, e.g.: paint patching up, replacing the back re ecting sticker and /or the 
cover  tted with rubber edge.

IF OPTIONAL ACCESSORIES ARE INCLUDED

, FURTHER MAINTENANCE IS REQUIRED AS FOLLOWS:

• Check the correct functioning of the safety accessories such as the inductive loop/s and the photocells.
• Check the correct functioning of the radio receiver and all of the remote controls.
• Check the correct functioning of the pressure switch.
• Check the correct functioning of the beeper.
• Check the correct functioning of the traffic lights and the respective control card.
•  Check  the  correct  functioning  of  the  solenoid  valve  in  emergency  cases  such  as  power  failure  or  disconnection,  assess 
therefore the status of the 24 Vdc voltage stabilizer.
• Check the correct functioning of EAR 35 acoustic analyzer to lower the bollard in emergency.

18

Содержание TALOS M50

Страница 1: ...fully retractable post Certified and tested in compliance with ASTM F2656 15 C750 former K12 PAS 68 2013 V 7500 N3 80 IWA 14 1 2013 V 7200 N3C 80 GB Instructions manual pages the gate opener EN 13241...

Страница 2: ...y to prohibit the operation of the engine when the pedestrian entrance is used Apply safety nameplates with CE marking on the gate warning about the presence of an automated installation The installer...

Страница 3: ...providing protection in case of accidental impacts with pedestrians etc and 12 LEDs flashing The foundation casing is made of treated steel hot dip galvanized while the structure of the inner assembl...

Страница 4: ...to gather in it and be pumped out of the bottom of the main pit by a submersed pump Lay a 50 mm 1 9 in corrugated tube suitable for the electric cables required to operate the bollard to be pulled th...

Страница 5: ...omer Nevertheless to allow that a few running tests to assess functioning are carried out before the installation it is possible to access the inner terminal board with the electrical connections by r...

Страница 6: ...sions in millimeters margin of tolerance of 0 5 cm 1 9 in The bollard is to be positioned and levelled on plane before casting concrete around the foundation cage The steel framework is to be class B4...

Страница 7: ...r cage 785 30 9 in 16 0 62 in n 4 pcs per cage 50 1 9 in n 2 lateral cages 200 7 8in 250 9 8 in 810 31 8 in 1 515 59 6 in 470 18 5 in English Anti terrorism retractable oil hydraulic bollard 7 140 5 5...

Страница 8: ...entire steel framework can be made by steel wire or welding nos 14 Transverse rectangular rebar rings 1 650 64 9 in 3 000 118 1 in 650 25 6 in 615 24 2 in English Joining of the cages and of the entir...

Страница 9: ...framework can be made by steel wire or welding pic 11 pic 12 900 35 4 in 1 600 62 9 in 1 600 62 9 in 600 23 6 in 16 0 62 in n 6 pcs n 3 pcs n 3 pcs 16 0 62 in n 3 pcs nos 3 Longitudinal rebars nos 3...

Страница 10: ...made by steel wire or welding pic 13 600 23 6 in 600 23 6 in 600 23 6 in 300 11 8 in 16 0 62 in n 6 pcs n 3 pcs n 3 pcs n 3 pcs 16 0 62 in n 3 pcs n 3 Reinforcing bars for the external side English A...

Страница 11: ...n 0 0 0 0 finished road level finished road level 1 2 cm 5 10 cm 850 33 4 in 1620 63 7 in Anti terrorism retractable oil hydraulic bollard Concrete features A Class C25 30 10 30 aggregates and Rck val...

Страница 12: ...eristics of the place of installation OPENING THE PROTECTION COVER PLATE Remove all the screws to be able to pull away the plate and then access the bollard inside for the electrical connections A wat...

Страница 13: ...F while L13 LED is ON If this does not happen swap connections to terminals 11 and 12 on the Elpro S50 control board L12 Limit switch Opening M3 normally ON it is off with post in down position L13 Li...

Страница 14: ...GAP BETWEEN THE POST AND PLATE IS UNIFORM ALL AROUND The protection plate must seat perfectly onto the entire surface and adhere also to the circular flange all around the post GREASE NOTE WELL IT IS...

Страница 15: ...ing operations are to be carried out Pull away the aluminium cover plate after having removed all the fixing screws Insert the release spanner in the slit on the right into the release device having a...

Страница 16: ...ight per gate leaf Installation date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including installation maintenance repairs...

Страница 17: ...Anti terrorism retractable oil hydraulic bollard 17...

Страница 18: ...ectronic board controlling the bollard s e g ooded relay contacts oxidized terminal clamps etc Check the correct functioning and positioning of the limit switches Check the release system for bollard...

Страница 19: ...hange this manual without previous notice As far as con guration and execution of the system are concerned these are to comply with the laws in the country of installation Meccanica Fadini is not liab...

Страница 20: ...in 230 V 50 Hz out 12 Vdc 600 mA Led lights 12 Vdc Post material S355K2H steel Impact resistance 700 000 J Crash resistance 2 000 000 J Maximun static load 20 000 kg Weight complete with casing 770 k...

Отзывы: