![fadini Coral 1080 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/fadini/coral-1080/coral-1080_fitting-instructions-manual_3165334005.webp)
5
40 cm
75 cm
15 cm
1,30 m
PIC. 6
PIC. 7
- Once located the enclosure into the pit, it is important that the
top edge is flush with the ground level.
- Fill with soil up to 75 cm and the remaining 40 cm with concrete
Pic. 6.
INNER ASSEMBLY INSTALLATION
For this operation it is fundamental that the location enclosure is
very firmly set in its foundation, therefore it has to be carried out
only after you are satisfied that the concrete is well set and the
electrical duct coupled to the enclosure and laid under the ground.
- A suitable lifting harness should be passed through the eye in
the bollard top and attached to a lifting mechanism. The assembly
should be raised from the ground and positioned directly above
the location enclosure.
- Next step. The motor and the limit switch cables should be pulled
through the duct (a rope pull-through previously inserted), and
the inner assembly gently lowered onto the location enclosure.
IMPORTANT: Pull the electric motor and limit switch cables through
the duct to the control unit. Be careful not to damage or remove
the cables from their termination Pic.7.
Once satisfied that the guide tube assembly is properly fitted inside the location enclosure, fit back the bollard lid and the enclosure
cover plate (Pic. 8 on page 6).
FRONT SIDE
BACK SIDE
IMPORTANT: Once the installation
operations are completed the
enclosure top edge must be flush
with road surface
75 cm
approx. Fill this
distance with soil
40 cm
approx. Fill this
distance with concrete
Concrete foundation
15 cm
approx. Shingle to
clear of standing water
Foundation
enclosure
Guide tube
assembly
FRONT SIDE
Electronic control unit
Elpro 10 PLUS CEI
Ø50 mm duct laid
under the ground
Lifting harness
Electric motor and limit
switch cables, 10 m length
Содержание Coral 1080
Страница 1: ...FITTING INSTRUCTIONS GB...