A separate 2 way switch for connecting 3 wheel drive is situated
on the battery charger box. When switched in the on position,
the 3 wheel drive is activated, when the handle switch is
activated in the first steep (slow speed). Handle switch second
step gives only drive on front wheel.

3.6 SAFETY INSTRUCTION.

When using the SPIDER you must always make sure that the
necessary stability is maintained. The control system secures
that the maximum reachable load according to the outreach is
limited by the chosen positions of the outriggers.

When max. capacity has been reached, a red “Stability” light on
the control box and on the outriggers with minimum load light
up. This indicates that the “cut-out” zone, has been reached.

Simultaneously all movements that could further reduce stability
are stopped. Only movements that will reduce the working radius
and centre the load are permitted. “Boom In” and “Boom Up”.

If the work demands a bigger outreach the outriggers must be
changed if the “cut-out” zone has been reached.

Changing the position of the outrigger shall only be performed
with platform in transport position and basket dismounted.

Safe work with the SPIDER demands that the instructions for
use and maintenance are followed, and that the daily safety
check is performed prior to the operation of the platform.

3.6.1 Daily Safety Checks

1.

Perform the daily check of safety system, and check the
platform for any defects such as: damaged cables or
chains; hydraulic leaks; loose wiring, structural damage,
damaged basket mounting brackets, tire damage, etc.

2.

Do not exceed the rated maximum payload of the platform.

3.

Check that all controls are functioning correctly in an area
free from obstructions.

4.

Check that all placards and decals are easily readable and
in place.

5.

The platform must be on hard flat ground and level.

6.

According to National Standards the platform must only be
used by qualified trained personnel.

7.

Work has to be stopped when wind exceeds 20 knots
(Windforce 6 after Beaufort).

8.

Work near on high voltage installations is prohibited. 

THE

SPIDER IS NOT INSULATED.

9.

When working on public roads or places, the working area must
be corded off and surrounded by signs of flashing yellow lights.

10. When the SPIDER is left unattended, it must be secured

against unauthorised use.

11. Do not operate the platform if it has a malfunction.

12. Do not operate unless all railings are in place and in

good condition.

13. Do not modify or remove any safety devices, placards or any

other part of the SPIDER, or use unauthorised components
for repairs. Modification without approval is an OSHA violation.

The platform must be checked for any malfunctions and greased
as per manufacturers specification.

The platform must have an annual inspection performed by a
certified aerial lift company.

NOTES

Содержание spider ts26

Страница 1: ...shortform operating instructions 0800 52 15 95 www facelift co uk spider ts26 narrow access...

Страница 2: ...level machine before use Wear a safety harness connected to a suitable anchorage point inside the platform Operate all controls smoothly Warn other people that you are there by means of flashing light...

Страница 3: ...UNDER THESE CIRCUMSTANCES FAILURE IN THE SAFETY SYSTEM CAN CAUSE INJURY OR DEATH CALL AUTHORISED SERVICE CENTRE IMMEDIATELY WHEN THE SPIDER IS USED FOR WELDING WORK THE SPIDER HAS TO BE UNPLUGGED AND...

Страница 4: ...THE GROUND IF ONE OR ALL RED LIGHTS REMAIN ON IT IS AN INDICATION THAT THE SAFETY SYSTEM IS NOT WORKING PROPERLY FAILURE IN THE SAFETY SYSTEM AND CONTINUED OPERATION CAN CAUSE INJURY OR DEATH CALL AU...

Страница 5: ...sket is levelled by a closed hydraulic circuit via a double chain system One chain is carrying the load and another chain is provided in case of emergency IF A CHAIN SHOULD BREAK THE PLATFORM MUST BE...

Страница 6: ...UTRIGGERS FULLY EXTENDED THE OUTRIGGERS MUST BE PLACED IN STANDARD POSITION SEE FIG FAILURE TO DO SO CAN COURSE INJURY OR DEATH IF THE BASE OF THE OUTRIGGER IS NOT LOCKED TO THE FRAME OF THE PLATFORM...

Страница 7: ...utriggers the platform must be on hard flat ground Make sure that the platform is in horizontal level by checking the level sight gauge located on the base of the platform chassis SETTING UP THE PLATF...

Страница 8: ...shall be used by personnel to gain access i e for maintenance and cleaning operations The platform is not isolated for work on or near high voltage installations and the platform shall not be used for...

Страница 9: ...Y ENGAGING ON THE HYDRAULIC VALVES DIRECTLY THE SAFETYSYSTEM OF THE PLATFORM IS OUT OF FUNCTION WHEN OPERATING THE PLATFORM DIRECTLY ON THE HYDRAULIC VALVES TELESCOPE IN IS THE ONLY FUNCTION TO BE USE...

Страница 10: ...CE 3 Lift the outriggers off the ground and loosen the hinged joints Lift the outriggers all the way up to stowed position and lock the toggle joints 4 For entering narrow places the outriggers can be...

Страница 11: ...the platform 3 6 1 Daily Safety Checks 1 Perform the daily check of safety system and check the platform for any defects such as damaged cables or chains hydraulic leaks loose wiring structural damage...

Страница 12: ...n and Liverpool We can train your personnel on any of the following equipment SL Scissor Lift SPB Self Propelled Boom VMP26 Truck Van mounted to 26m VMP200 Truck mounted over 26m VPP Vertical Personne...

Отзывы: