10
5
After the regulation for height adjustment, insert
the upper chimney stack from above, and leave it
running free on the frame.
Upper Flue Must Be In Place
Before Proceeding
6
Install Damper that is included with the Hood before
connecting to the ductwork.
Only for Ducted Venting
Installation
7
Now take either your woods screws or bolts
depending on your set-up and screw all four
into the pilot holes and leave 1/4" of the
heads exposed.
Next install a UL or CSA listed strain relief
in the wiring box so that the screws can
be tightened after the chimney support is
attached to the ceiling.
Now lift the chimney support into it's final
position and feed the electrical supply through
the strain relief.
Next position the chimney support so that
the large end of the keyhole slots are over
the ceiling attachment screws or bolts. Then
push the chimney support so that the bolts
are in the neck of the slots. Tighten all four
screws or bolts securely.
• The frame mountings must be secure to
withstand the weight of the hood and any
stresses caused by the occasional side
thrust applied to the device. On completion,
check that the base is stable, even if the
frame is subjected to bending.
• In all cases where the ceiling is not
strong enough at the suspension point,
the installer must provide strengthening
using suitable plates and backing pieces
anchored to the structurally sound parts.
Содержание TRATIS36SS600-B
Страница 5: ...5 RANGEHOOD DIMENSIONS Min 24 ...
Страница 18: ...18 Wiring Diagram Dolce Corrado 17 Feb 2016 Released ...
Страница 23: ...23 Min 24 DIMENSIONS DE LA HOTTE ...
Страница 36: ...36 Dolce Corrado 17 Feb 2016 Released Wiring Diagram ...
Страница 38: ...38 ...
Страница 39: ...39 ...
Страница 40: ...991 0440 915_01 160302 D002497_00 ...