Faber Relaxed Premium XL Скачать руководство пользователя страница 8

Installation

 

Instructions

 

 

7 < 

<

 

<

 

<

 

construction

 

with

 

proper

 

insulation

 

and

 

protection.

 

And

 

ensure

 

respective

 

distance.

 

 

Ensure

 

for

 

great

 

discharge

 

lengths

 

that

 

the

 

concentric

 

discharge

 

material

 

is

 

supported

 

every

 

meter,

 

so

 

that

 

the

 

weight

 

of

 

the

 

material

 

is

 

not

 

supported

 

by

 

the

 

fire.

 

 

It

 

is

 

not

 

permitted

 

to

 

start

 

directly

 

on

 

the

 

device

 

with

 

concentric

 

cut

 

down

 

pipe

 

material.

 

 

The

 

air

 

supply

 

could

 

then

 

possibly

 

be

 

closed.

  

3.4

 

Terminals

  

The

 

combined

 

supply

 

and

 

discharge

 

can

 

be

 

done

 

both

 

via

 

wall

 

or

 

through

 

the

 

roof

 

or

 

through

 

an

 

existing

 

chimney.

 

 

Please

 

note:

 

Verify

 

if

 

the

 

position

 

of

 

the

 

terminal

 

meets

 

the

 

local

 

regulations

 

regarding

 

ventilation

 

openings.

 

For

 

proper

 

functioning,

 

the

 

air

 

supply

 

and

 

combustion

 

gas

 

discharge

 

are

 

not

 

to

 

be

 

obstructed.

 

The

 

minimum

 

distances

 

are

 

specified

 

in

 

Chapter

 

15.

 

3.4.1

 

C

11

,

 

Wall

 

terminal.

 

For

 

a

 

facade

 

or

 

wall

 

outlet

 

use

 

a

 

wall

 

terminal.

 

(see

 

Fig.

 

3.5

 

C

11

)

 

Depending

 

on

 

the

 

calculation

 

this

 

can

 

be

 

a

 

diameter

 

of

 

130/200mm

 

or

 

100/150mm.

 

3.4.2

 

C

31

,

 

Roof

 

terminal.

 

For

 

a

 

flat

 

or

 

pits

 

roof

 

outlet

 

use

 

a

 

long

 

roof

 

outlet

 

with

 

a

 

diameter

 

of

 

100/150mm

 

(see

 

Fig.

 

3.5

 

C

31

)

 

3.4.3

 

C

91

,

 

Existing

 

chimney.

 

For

 

an

 

existing

 

chimney

 

use

 

the

 

short

 

chimney

 

outlet

 

with

 

a

 

diameter

 

of

 

100/150mm

 

(see

 

Fig.

 

3.5

 

C

91

).

 

 

In

 

this

 

case

 

the

 

existing

 

chimney

 

acts

 

as

 

air

 

inlet

 

an

 

inserted

 

flexible

 

stainless

 

steel

 

pipe

 

discharges

 

the

 

flue

 

gas.

 

The

 

top

 

and

 

the

 

bottom

 

should

 

be

 

airtight.

 

Depending

 

on

 

the

 

calculated

 

outlet

 

diameter,

 

use

 

a

 

flexible

 

stainless

 

steel

 

tube

 

of

 

Ø

 

100mm

 

or

 

Ø

 

130mm

 

with

 

CE

 

marking

 

for

 

600°C.

 

 

Please

 

note:

 

The

 

minimum

 

chimney

 

diameter

 

for

 

a

 

130mm

 

flexible

 

stainless

 

steel

 

pipe

 

must

 

200

 

x

 

200mm.

 

And

 

for

 

a

 

100mm

 

flexible

 

stainless

 

steel

 

pipe

 

150x150mm.

  

4

 

Preparation

 

and

 

installation

 

instructions

 

4.1

 

Gas

 

connection

 

The

 

gas

 

connection

 

must

 

comply

 

with

 

the

 

applicable

 

local

 

standards.

 

We

 

advise

 

using

 

a

 

Ø

 

15mm

 

gas

 

connection

 

directly

 

from

 

the

 

gas

 

meter

 

to

 

the

 

appliance,

 

with

 

a

 

shut

off

 

valve

 

in

 

the

 

proximity

 

of

 

the

 

appliance,

 

which

 

must

 

always

 

be

 

freely

 

accessible.

 

Position

 

the

 

gas

 

connection

 

so

 

that

 

it

 

is

 

easily

 

accessible

 

at

 

all

 

times

 

for

 

service,

 

and

 

that

 

the

 

burner

 

unit

 

can

 

be

 

disassembled.

  

4.2

 

Electrical

 

connection

 

The

 

power

 

supply

 

must

 

comply

 

with

 

the

 

applicable

 

local

 

standards.

 

A

 

6

 

Volt

 

adapter

 

is

 

used.

 

For

 

this,

 

a

 

wall

 

socket

 

230VAC/50Hz

 

must

 

be

 

installed

 

near

 

the

 

fire.

 

4.2.1

 

Faber

 

ITC,

  

Intelligent

 

Technical

 

Controller

 

The

 

ITC

 

gives

 

you

 

more

 

options,

 

such

 

as

 

ECO

 

control,

 

control,

 

error

 

message,

 

maintenance

 

advice

 

and

 

such.

  

 

For

 

further

 

information,

 

see

 

the

 

“ITC”

 

user

 

manual.

  

Find

 

further

 

information

 

at

 

www.Faber.nl

  

 

4.3

 

Preparing

 

the

 

fire

 

 

Remove

 

the

 

fire

 

from

 

its

 

packaging.

 

Ensure

 

that

 

the

 

gas

 

supply

 

pipes

 

under

 

the

 

appliance

 

are

 

not

 

damaged.

  

 

Remove

 

frame

 

and

 

glass

 

and

 

take

 

the

 

packaged

 

parts

 

from

 

the

 

fire.

 

 

Store

 

frame

 

and

 

glass

 

in

 

a

 

safe

 

place.

 

 

Prepare

 

the

 

gas

 

connection

 

on

 

the

 

regulator

 

4.4

 

Positioning

 

the

 

fire

 

Take

 

the

 

installation

 

requirements

 

into

 

account

 

(see

 

Chapter

 

3).

  

Place

 

the

 

unit

 

in

 

the

 

right

 

position

 

and

 

set

 

the

 

height

 

with

 

the

 

leg

 

levellers.

 

Height

 

adjustment

 

and

 

levelling

 

of

 

the

 

fire

 

(see

 

Fig.

 

1.9B).

 

Rough

 

height

 

adjustment:

  

 

with

 

the

 

extendable

 

leg,

 

or

 

with

 

the

 

long

 

legs

 

supplied.

  

Содержание Relaxed Premium XL

Страница 1: ...Relaxed Premium XL 40010949 14xx Relaxed Premium XL ENG ...

Страница 2: ...Installation Instructions 1 3 alternative finishes 1 1a 1 1b 1 1c ...

Страница 3: ...Installation Instructions 2 1 2 1 3 1 4 7 ...

Страница 4: ...Installation Instructions 3 1 9 1 5 1 6 B ...

Страница 5: ...Installation Instructions 4 2 1 2 2 2 3 3 1 3 2 3 3 3 4 ...

Страница 6: ...Installation Instructions 5 3 5 4 1 4 2 4 3 ...

Страница 7: ...re and heating purposes This means that all surfaces including the glass can be very hot over 100 C exceptions to this are the bottom of the fire and the control elements Do not place any combustible materials within 0 5 m of the radiation area of the fire Light the fire for the first time and run for several hours on the highest setting so that the paint can cure Provide adequate ventilation so t...

Страница 8: ...of Ø 100mm or Ø 130mm with CE marking for 600 C Please note The minimum chimney diameter for a 130mm flexible stainless steel pipe must 200 x 200mm And for a 100mm flexible stainless steel pipe 150x150mm 4 Preparation and installation instructions 4 1 Gas connection The gas connection must comply with the applicable local standards We advise using a Ø 15mm gas connection directly from the gas mete...

Страница 9: ...assage of 200cm2 per grid or a similar alternative Place above the grates a screen plate made of non combustible material see Fig 1 9A 4 6 3 Installation and finishing For installation and finishing the following points are of interest A Fixing points Fig 1 2 B Mouldings Fig 1 2 C Spacer Fig 1 2 D F and H Fig 1 3 Please note Ensure that the fire is not load bearing with regard to the false chimney...

Страница 10: ...bution is good Move the chips if necessary until a good flame distribution is achieved 7 Checking the installation 7 1 Checking the main burner ignition pilot flame Ignite the fire as described in the user manual Check that the pilot flame is well above the main burner and not covered by chips Check the ignition of the main burner on full and small setting ignition must be smooth and quiet 7 2 Che...

Страница 11: ...lacing the batteries and setting the receiver Handover to customer o Installation instructions o User manual o ITC operating instructions o Log set instruction card o Suction Cups o Magnetic snapper 9 Annual maintenance 9 1 Checking and cleaning Check and clean if necessary after verification o The pilot light o The burner for LPG flat burner the ceramic burner top o The combustion chamber o The g...

Страница 12: ...ts H J L M P and R Fig 12 1 end 12 2 Elbows 90 in the horizontal plane Horizontal bends are bends which are entirely in the horizontal plane Fig 12 1 12 2 and 12 3 I K and Q Bends 45 or 30 in the horizontal plane Horizontal bends are bends which are entirely in the horizontal plane Bends Elbows 90 vertical to horizontal plane These are 90 elbows which proceed from horizontal to vertical Fig 12 2 a...

Страница 13: ...Installation Instructions 12 11 1 Table for pipe diameter 150 100mm Start Length STL Vertical TVH and Horizontal THL 11 2 STL TVH THL ...

Страница 14: ...Installation Instructions 13 Table for pipe diameter 130 200mm Startlength STL Vertical TVH en Horizontal THL STL THL TVH ...

Страница 15: ...Installation Instructions 14 12 Example Fig 12 1 Fig 12 2 Fig 12 3 ...

Страница 16: ...Installation Instructions 15 13 Calculation Sheet ...

Страница 17: ...Installation Instructions 16 ...

Страница 18: ... 15ºC and 1013 mbar gr h 680 700 Burner pressure at full mark mbar 12 25 1 31 Injector main burner mm ST 510 7x0 83 ST 510 7x0 83 ST 180 7x0 50 ST 160 7x0 50 ST 180 7x0 50 ST 160 7x0 50 Reduced input restraint mm 1 8 1 4 1 4 Pilot assembly SIT 145 SIT 145 SIT 145 Code Injector Nr 36 Nr 23 Nr 23 Flue size mm 200 130 200 130 200 130 Gas control valve GV60 GV60 GV60 Gas connection 3 8 3 8 3 8 Electri...

Страница 19: ... Distance mm D Under a gutter 500 E Under a roof edge 500 F Under a carport or balcony 500 G Vertical downpipe 300 H Inside and outside corners 500 J From wall surface to a wall outlet 1000 K Two gable outlets against over each other 1000 L Distance between two roof outlets 450 M Two roof outlets above each other on a pitched roof 1000 N Two gable outlets next to each other 1000 Short roof termina...

Страница 20: ...Installation Instructions 19 16 Dimensional drawings 16 1 Relaxed Premium L 348 Ext ...

Страница 21: ...Installation Instructions 20 16 2 Ventilation grid and control door ...

Страница 22: ...Installation Instructions 21 Dealer info ...

Отзывы: