Faber Relaxed Premium XL Скачать руководство пользователя страница 10

Installation

 

Instructions

 

 

9 < 

<

 

<

 

<

 

5

 

Removing

 

the

 

glass

  

 

Remove

 

the

 

mouldings,

 

see

 

Chapter

 

4.6.6

  

 

Place

 

the

 

suction

 

cups

 

on

 

the

 

glass.

  

 

Draw

 

the

 

sealing

 

cord

 

from

 

the

 

slot.

 

(Fig.

 

2.1).

 

 

Slide

 

the

 

glass

 

to

 

the

 

top

 

so

 

that

 

the

 

bottom

 

is

 

released

 

from

 

the

 

slot.

 

Now

 

pull

 

the

 

glass

 

out

 

and

 

gradually

 

down.

 

(Fig.

 

2.3).

 

6

 

Placing

 

the

 

decoration

 

material

 

It

 

is

 

not

 

permitted

 

to

 

use

 

other

 

or

 

to

 

add

 

more

 

material

 

in

 

the

 

combustion

 

chamber.

 

Keep

 

the

 

pilot

 

light

 

always

 

free

 

of

 

decoration

 

material!

 

Do

 

not

 

place

 

all

 

decoration

 

material

 

at

 

one

 

time

 

on

 

the

 

burner;

 

the

 

fabric

 

parts

 

can

 

block

 

it.

 

6.1

 

Log

 

set

 

 

Place

 

some

 

of

 

the

 

chips

 

on

 

the

 

burner

 

and

 

on

 

the

 

bottom.

 

 

Place

 

the

 

logs

 

as

 

specified.

 

(see

 

Fig.

 

(4.1

 

of

 

included

 

log

 

set

 

card)

  

 

Divide

 

the

 

rest

 

of

 

the

 

chips

 

on

 

the

 

burner

 

and

 

on

 

the

 

bottom.

 

Prevent

 

a

 

thick

 

layer

 

on

 

the

 

burner;

 

this

 

adversely

 

affects

 

the

 

fire

 

image.

 

6.2

 

Glow

 

wire

 

The

 

glow

 

wire

 

gives

 

a

 

decorative

 

glow

 

effect.

 

 

Pull

 

the

 

wool

 

well

 

apart

 

and

 

place

 

in

 

different

 

places

 

tufts

 

on

 

the

 

burner.

  

 

 

Please

 

note:

  

Do

 

not

 

use

 

the

 

glow

 

wire

 

near

 

the

 

pilot

 

flame!

  

This

 

can

 

cause

 

a

 

short

 

circuit

 

in

 

the

 

ignition

 

system!

 

 

6.3

 

Pebbles

  

 

Place

 

the

 

pebbles

 

on

 

the

 

burner

 

and

 

on

 

the

 

bottom.

 

(see

 

Fig.

 

4.2

 

and

 

4.3

 

of

 

included

 

wood

 

set

 

card).

 

Prevent

 

a

 

double

 

layer;

 

this

 

adversely

 

affects

 

the

 

fire

 

image.

 

 

Replace

 

the

 

glass

 

and

 

check

 

the

 

fire

 

image.

  

 

Start

 

the

 

fire

 

as

 

described

 

in

 

the

 

user

 

manual.

 

Check

 

if

 

the

 

flame

 

distribution

 

is

 

good.

 

Move

 

the

 

chips

 

if

 

necessary,

 

until

 

a

 

good

 

flame

 

distribution

 

is

 

achieved.

 

7

 

Checking

 

the

 

installation

 

7.1

 

Checking

 

the

 

main

 

burner

 

ignition,

 

pilot

 

flame

 

Ignite

 

the

 

fire

 

as

 

described

 

in

 

the

 

user

 

manual.

 

 

Check

 

that

 

the

 

pilot

 

flame

 

is

 

well

 

above

 

the

 

main

 

burner

 

and

 

not

 

covered

 

by

 

chips.

  

 

Check

 

the

 

ignition

 

of

 

the

 

main

 

burner

 

on

 

full

 

and

 

small

 

setting.

 

(ignition

 

must

 

be

 

smooth

 

and

 

quiet).

 

7.2

 

Checking

 

for

 

gas

 

leaks

 

Check

 

with

 

a

 

gas

 

leak

 

finder

 

or

 

spray

 

all

 

connections

 

and

 

pipes

 

for

 

gas

 

leakage.

 

7.3

 

Checking

 

the

 

burner

 

pressure

 

and

 

primary

 

pressure

 

Check

 

that

 

the

 

burner

 

pressure

 

and

 

primary

 

pressure

 

match

 

the

 

information

 

listed

 

in

 

the

 

manual,

 

Chapter

 

14

 

Technical

 

specifications.

  

 

Measuring

 

the

 

primary

 

pressure:

 

 

Close

 

the

 

shutoff

 

valve.

 

 

Turn

 

measuring

 

nipple

 

B

 

(see

 

Fig.

 

3.2)

 

some

 

turns

 

open

 

and

 

connect

 

a

 

measuring

 

hose

 

to

 

the

 

gas

 

regulator.

 

 

Take

 

this

 

measurement

 

at

 

highest

 

setting

 

of

 

the

 

fire

 

and

 

when

 

the

 

fire

 

is

 

set

 

to

 

pilot

 

light.

 

 

Do

 

not

 

connect

 

the

 

unit

 

if

 

the

 

pressure

 

is

 

too

 

high.

 

 

Measuring

 

the

 

burner

 

pressure:

 

Check

 

the

 

burner

 

pressure

 

only

 

with

 

proper

 

primary

 

pressure.

  

 

Turn

 

measuring

 

nipple

 

A

 

(see

 

Fig.

 

3.2)

 

some

 

turns

 

open

 

and

 

connect

 

a

 

measuring

 

hose

 

to

 

the

 

gas

 

regulator.

 

 

The

 

pressure

 

must

 

correspond

 

to

 

the

 

value

 

indicated

 

in

 

the

 

technical

 

specifications

 

of

 

this

 

manual.

 

In

 

case

 

of

 

deviation

 

contact

 

the

 

manufacturer.

 

 

Please

 

note:

 

Close

 

all

 

pressure

 

measuring

 

nipples

 

and

 

check

 

for

 

gas

 

leakage.

 

7.4

 

Checking

 

the

 

flame

 

image

 

Let

 

the

 

fire

 

burn

 

for

 

at

 

least

 

20

 

minutes

 

at

 

highest

 

setting

 

and

 

check

 

the

 

flame

 

for:

 

1.

 

Flame

 

distribution

 

2.

 

Colour

 

of

 

the

 

flames

 

 

Содержание Relaxed Premium XL

Страница 1: ...Relaxed Premium XL 40010949 14xx Relaxed Premium XL ENG ...

Страница 2: ...Installation Instructions 1 3 alternative finishes 1 1a 1 1b 1 1c ...

Страница 3: ...Installation Instructions 2 1 2 1 3 1 4 7 ...

Страница 4: ...Installation Instructions 3 1 9 1 5 1 6 B ...

Страница 5: ...Installation Instructions 4 2 1 2 2 2 3 3 1 3 2 3 3 3 4 ...

Страница 6: ...Installation Instructions 5 3 5 4 1 4 2 4 3 ...

Страница 7: ...re and heating purposes This means that all surfaces including the glass can be very hot over 100 C exceptions to this are the bottom of the fire and the control elements Do not place any combustible materials within 0 5 m of the radiation area of the fire Light the fire for the first time and run for several hours on the highest setting so that the paint can cure Provide adequate ventilation so t...

Страница 8: ...of Ø 100mm or Ø 130mm with CE marking for 600 C Please note The minimum chimney diameter for a 130mm flexible stainless steel pipe must 200 x 200mm And for a 100mm flexible stainless steel pipe 150x150mm 4 Preparation and installation instructions 4 1 Gas connection The gas connection must comply with the applicable local standards We advise using a Ø 15mm gas connection directly from the gas mete...

Страница 9: ...assage of 200cm2 per grid or a similar alternative Place above the grates a screen plate made of non combustible material see Fig 1 9A 4 6 3 Installation and finishing For installation and finishing the following points are of interest A Fixing points Fig 1 2 B Mouldings Fig 1 2 C Spacer Fig 1 2 D F and H Fig 1 3 Please note Ensure that the fire is not load bearing with regard to the false chimney...

Страница 10: ...bution is good Move the chips if necessary until a good flame distribution is achieved 7 Checking the installation 7 1 Checking the main burner ignition pilot flame Ignite the fire as described in the user manual Check that the pilot flame is well above the main burner and not covered by chips Check the ignition of the main burner on full and small setting ignition must be smooth and quiet 7 2 Che...

Страница 11: ...lacing the batteries and setting the receiver Handover to customer o Installation instructions o User manual o ITC operating instructions o Log set instruction card o Suction Cups o Magnetic snapper 9 Annual maintenance 9 1 Checking and cleaning Check and clean if necessary after verification o The pilot light o The burner for LPG flat burner the ceramic burner top o The combustion chamber o The g...

Страница 12: ...ts H J L M P and R Fig 12 1 end 12 2 Elbows 90 in the horizontal plane Horizontal bends are bends which are entirely in the horizontal plane Fig 12 1 12 2 and 12 3 I K and Q Bends 45 or 30 in the horizontal plane Horizontal bends are bends which are entirely in the horizontal plane Bends Elbows 90 vertical to horizontal plane These are 90 elbows which proceed from horizontal to vertical Fig 12 2 a...

Страница 13: ...Installation Instructions 12 11 1 Table for pipe diameter 150 100mm Start Length STL Vertical TVH and Horizontal THL 11 2 STL TVH THL ...

Страница 14: ...Installation Instructions 13 Table for pipe diameter 130 200mm Startlength STL Vertical TVH en Horizontal THL STL THL TVH ...

Страница 15: ...Installation Instructions 14 12 Example Fig 12 1 Fig 12 2 Fig 12 3 ...

Страница 16: ...Installation Instructions 15 13 Calculation Sheet ...

Страница 17: ...Installation Instructions 16 ...

Страница 18: ... 15ºC and 1013 mbar gr h 680 700 Burner pressure at full mark mbar 12 25 1 31 Injector main burner mm ST 510 7x0 83 ST 510 7x0 83 ST 180 7x0 50 ST 160 7x0 50 ST 180 7x0 50 ST 160 7x0 50 Reduced input restraint mm 1 8 1 4 1 4 Pilot assembly SIT 145 SIT 145 SIT 145 Code Injector Nr 36 Nr 23 Nr 23 Flue size mm 200 130 200 130 200 130 Gas control valve GV60 GV60 GV60 Gas connection 3 8 3 8 3 8 Electri...

Страница 19: ... Distance mm D Under a gutter 500 E Under a roof edge 500 F Under a carport or balcony 500 G Vertical downpipe 300 H Inside and outside corners 500 J From wall surface to a wall outlet 1000 K Two gable outlets against over each other 1000 L Distance between two roof outlets 450 M Two roof outlets above each other on a pitched roof 1000 N Two gable outlets next to each other 1000 Short roof termina...

Страница 20: ...Installation Instructions 19 16 Dimensional drawings 16 1 Relaxed Premium L 348 Ext ...

Страница 21: ...Installation Instructions 20 16 2 Ventilation grid and control door ...

Страница 22: ...Installation Instructions 21 Dealer info ...

Отзывы: