Faber Relaxed Premium XL Скачать руководство пользователя страница 11

Installation

 

Instructions

 

 

10 < 

<

 

<

 

<

 

If

 

one

 

or

 

both

 

points

 

are

 

not

 

acceptable

 

then

 

check:

 

 

The

 

log

 

set

 

layout

 

and/or

 

the

 

amount

 

of

 

chips

 

on

 

the

 

burner.

 

 

The

 

pipe

 

connections

 

for

 

leaks

 

(in

 

case

 

of

 

blue

 

flames).

 

 

Whether

 

the

 

correct

 

Restrictor

 

is

 

fitted.

 

 

The

 

outlet.

  

o

 

Wall

 

terminal

 

right

 

side

 

up

 

o

 

Roof

 

terminal

 

on

 

the

 

right

 

position

 

o

 

If

 

the

 

maximum

 

horizontal

 

flue

 

lengths

 

is

 

not

 

exceeded.

 

7.5

 

Flue

 

gas

 

analyzer

 

If

 

you

 

are

 

in

 

possession

 

of

 

a

 

CO/CO2

 

flue

 

gas

 

analyzer,

 

then

 

it

 

is

 

possible

 

to

 

check

 

the

 

supply

 

air

 

and

 

the

 

combustion

 

gases.

 

There

 

are

 

two

 

measuring

 

pipes

 

at

 

the

 

front

 

of

 

the

 

fire

 

between

 

the

 

mounting

 

frame

 

and

 

the

 

glass

 

(Fig.

 

3.3

 

A

 

and

 

B).

 

 

The

 

ratio

 

CO2

 

and

 

CO

 

must

 

not

 

be

 

greater

 

than

 

1:100

 

Example:

 

CO2

 

is

 

4%

 

and

 

CO

 

is

 

400ppm,

 

measured

 

at

 

the

 

highest

 

point

 

 

If

 

the

 

ratio

 

is

 

greater

 

than

 

1:100

 

or

 

exhaust

 

gases

 

are

 

measured

 

in

 

the

 

supply

 

air,

 

then

 

also

 

check

 

above

 

points.

 

8

 

Instructions

 

for

 

client

 

 

Recommend

 

that

 

the

 

unit

 

should

 

be

 

checked

 

annually

 

by

 

a

 

qualified

 

specialist

 

to

 

ensure

 

the

 

safe

 

use

 

and

 

to

 

guarantee

 

a

 

long

 

service

 

life.

 

 

Give

 

advice

 

and

 

instructions

 

on

 

care

 

and

 

cleaning

 

of

 

the

 

glass.

 

Highlight

 

the

 

danger

 

of

 

burnt

in

 

fingerprints.

 

 

Instruct

 

the

 

customer

 

on

 

the

 

operation

 

of

 

the

 

unit

 

and

 

the

 

remote

 

control,

 

including

 

replacing

 

the

 

batteries

 

and

 

setting

 

the

 

receiver.

 

 

Handover

 

to

 

customer:

 

o

 

Installation

 

instructions

  

o

 

User

 

manual

  

o

 

ITC

 

operating

 

instructions

  

o

 

Log

 

set

 

instruction

 

card

  

o

 

Suction

 

Cups

  

o

 

Magnetic

 

snapper

 

9

 

Annual

 

maintenance

 

9.1

 

Checking

 

and

 

cleaning:

 

 

Check

 

and

 

clean

 

if

 

necessary

 

after

 

verification:

 

o

 

The

 

pilot

 

light

  

o

 

The

 

burner;

 

for

 

LPG

 

flat

 

burner

 

the

 

ceramic

 

burner

 

top.

  

o

 

The

 

combustion

 

chamber

 

o

 

The

 

glass

  

o

 

The

 

logs

 

for

 

breakage.

 

o

 

The

 

outlet.

  

 

Replace,

 

if

 

necessary:

 

o

 

Chips/Embers/

 

Glow

 

wire

 

9.2

 

Cleaning

 

the

 

glass

 

Most

 

deposits

 

can

 

be

 

removed

 

with

 

a

 

dry

 

cloth.

 

Clean

 

the

 

glass

 

with

 

a

 

ceramic

 

hob

 

cleaner.

  

 

Please

 

note:

 

Avoid

 

fingerprints

 

on

 

the

 

glass.

 

These

 

are

 

no

 

longer

 

removable

 

after

 

they

 

are

 

burnt

 

in!

 

 

Now

 

carry

 

out

 

check

up

 

as

 

described

 

in

 

Chapter

 

7

 

“Checking

 

after

 

installation”.

 

10

 

Conversion

 

to

 

other

 

gas

 

type

 

The

 

conversion

 

to

 

a

 

different

 

gas

 

type

 

may

 

only

 

be

 

performed

 

by

 

a

 

qualified

 

installer/dealer.

 

10.1

 

Conversion

 

from

 

natural

 

gas

 

to

 

propane

 

(or

 

vice

 

versa)

 

This

 

can

 

only

 

be

 

done

 

by

 

replacing

 

the

 

burner.

 

To

 

do

 

so,

 

please

 

contact

 

your

 

dealer.

 

Specify

 

with

 

your

 

order

 

always

 

the

 

type

 

and

 

serial

 

number

 

of

 

the

 

device.

 

11

 

Flue

 

calculation

 

A

 

simple

 

way

 

to

 

calculate

 

whether

 

the

 

exhaust

 

configuration

 

is

 

possible

 

in

 

combination

 

with

 

your

 

fire,

 

use

 

the

 

free

 

“Faber

 

Flue

 

App”

 

and

 

download

 

from:

 

 

INTERNET:

 

BlackBerry,

 

Android,

 

PC

 

(with

 

Google

 

Chrome

 

browser)

 

APP

 

store:

  

iPhone,

 

iPad

 

and

 

Mac.

 

Google

 

Play:

  

Android

 

smartphones

 

and

 

Android

 

tablets.

 

Содержание Relaxed Premium XL

Страница 1: ...Relaxed Premium XL 40010949 14xx Relaxed Premium XL ENG ...

Страница 2: ...Installation Instructions 1 3 alternative finishes 1 1a 1 1b 1 1c ...

Страница 3: ...Installation Instructions 2 1 2 1 3 1 4 7 ...

Страница 4: ...Installation Instructions 3 1 9 1 5 1 6 B ...

Страница 5: ...Installation Instructions 4 2 1 2 2 2 3 3 1 3 2 3 3 3 4 ...

Страница 6: ...Installation Instructions 5 3 5 4 1 4 2 4 3 ...

Страница 7: ...re and heating purposes This means that all surfaces including the glass can be very hot over 100 C exceptions to this are the bottom of the fire and the control elements Do not place any combustible materials within 0 5 m of the radiation area of the fire Light the fire for the first time and run for several hours on the highest setting so that the paint can cure Provide adequate ventilation so t...

Страница 8: ...of Ø 100mm or Ø 130mm with CE marking for 600 C Please note The minimum chimney diameter for a 130mm flexible stainless steel pipe must 200 x 200mm And for a 100mm flexible stainless steel pipe 150x150mm 4 Preparation and installation instructions 4 1 Gas connection The gas connection must comply with the applicable local standards We advise using a Ø 15mm gas connection directly from the gas mete...

Страница 9: ...assage of 200cm2 per grid or a similar alternative Place above the grates a screen plate made of non combustible material see Fig 1 9A 4 6 3 Installation and finishing For installation and finishing the following points are of interest A Fixing points Fig 1 2 B Mouldings Fig 1 2 C Spacer Fig 1 2 D F and H Fig 1 3 Please note Ensure that the fire is not load bearing with regard to the false chimney...

Страница 10: ...bution is good Move the chips if necessary until a good flame distribution is achieved 7 Checking the installation 7 1 Checking the main burner ignition pilot flame Ignite the fire as described in the user manual Check that the pilot flame is well above the main burner and not covered by chips Check the ignition of the main burner on full and small setting ignition must be smooth and quiet 7 2 Che...

Страница 11: ...lacing the batteries and setting the receiver Handover to customer o Installation instructions o User manual o ITC operating instructions o Log set instruction card o Suction Cups o Magnetic snapper 9 Annual maintenance 9 1 Checking and cleaning Check and clean if necessary after verification o The pilot light o The burner for LPG flat burner the ceramic burner top o The combustion chamber o The g...

Страница 12: ...ts H J L M P and R Fig 12 1 end 12 2 Elbows 90 in the horizontal plane Horizontal bends are bends which are entirely in the horizontal plane Fig 12 1 12 2 and 12 3 I K and Q Bends 45 or 30 in the horizontal plane Horizontal bends are bends which are entirely in the horizontal plane Bends Elbows 90 vertical to horizontal plane These are 90 elbows which proceed from horizontal to vertical Fig 12 2 a...

Страница 13: ...Installation Instructions 12 11 1 Table for pipe diameter 150 100mm Start Length STL Vertical TVH and Horizontal THL 11 2 STL TVH THL ...

Страница 14: ...Installation Instructions 13 Table for pipe diameter 130 200mm Startlength STL Vertical TVH en Horizontal THL STL THL TVH ...

Страница 15: ...Installation Instructions 14 12 Example Fig 12 1 Fig 12 2 Fig 12 3 ...

Страница 16: ...Installation Instructions 15 13 Calculation Sheet ...

Страница 17: ...Installation Instructions 16 ...

Страница 18: ... 15ºC and 1013 mbar gr h 680 700 Burner pressure at full mark mbar 12 25 1 31 Injector main burner mm ST 510 7x0 83 ST 510 7x0 83 ST 180 7x0 50 ST 160 7x0 50 ST 180 7x0 50 ST 160 7x0 50 Reduced input restraint mm 1 8 1 4 1 4 Pilot assembly SIT 145 SIT 145 SIT 145 Code Injector Nr 36 Nr 23 Nr 23 Flue size mm 200 130 200 130 200 130 Gas control valve GV60 GV60 GV60 Gas connection 3 8 3 8 3 8 Electri...

Страница 19: ... Distance mm D Under a gutter 500 E Under a roof edge 500 F Under a carport or balcony 500 G Vertical downpipe 300 H Inside and outside corners 500 J From wall surface to a wall outlet 1000 K Two gable outlets against over each other 1000 L Distance between two roof outlets 450 M Two roof outlets above each other on a pitched roof 1000 N Two gable outlets next to each other 1000 Short roof termina...

Страница 20: ...Installation Instructions 19 16 Dimensional drawings 16 1 Relaxed Premium L 348 Ext ...

Страница 21: ...Installation Instructions 20 16 2 Ventilation grid and control door ...

Страница 22: ...Installation Instructions 21 Dealer info ...

Отзывы: