background image

 

Installation manual Matrix 450/500 III and MatriX 450/650 III

 

12 < 

<

 

<

 

False chimney 

 

Construct the false chimney of non-com-
bustible material in combination with 
metal profiles or of masonry/concrete 
blocks. 

 

Always use a lintel or reinforcing bars 
while bricking the false chimney. They 
should not be placed directly on the fire-
place. 

 

Make sure that the fireplace never func-
tions as a load-bearing construction, be-
cause of the expansion of the fireplace 
through warmth. 

 

Ventilation 

Correct ventilation prevents damaging overheating 
of the gas control block and its electronics and also 
limits the temperature of the convection air. Use 
the (optional) supplied Faber ventilation grids (arti-
cle number A9296400) or a similar alternative with 
a minimum free passage of 200cm² per grid, in the 
space above the fire, when building the false  
chimney. Within the false chimney, an horizontal 
screen plate, made of non-combustible material, 
must be installed just above the ventilation open-
ings. (see “A” in fig. 1.0). 

 
Installation and finishing 

 

 

Please note! 

 

Take into account a minimum distance of 
2mm due to expansion of the fireplace. 

 

Take into account the thickness of any fin-
ishing layer! 

 
The following points are important for installation 
and finishing. 
 

H.

 

= Cover trim (fig. 2.4 and 2.7) 

I.

 

= Spacer (fig. 2.4) 

J.

 

= Upper flange of the combustion cham-
ber (fig. 2.5). 

K.

 

= Spacer / glass support (fig. 2.6) 

L.

 

= Spacer / glass support (fig. 2.6) 

 
Method I: Installation WITH the cover trim (fig. 2.2)  
Build the false chimney or platform against the 
decorative strips “

H

” and the spacers “

I

” (see fig. 

2.4 and 2.7). 
 
Method II: Installation WITHOUT the cover trim 
(fig. 2.3). 
Remove the distance profiles “

I

” (see fig. 2.4).

 

 

 

Please note! 

Make sure that the distance profile screws “

I

” 

are replaced at the front to ensure that the ap-
pliance is air tight. 

 

Build the platform against the glass sup-
ports “

K

” and “

L

” (see fig. 2.6) 

 

Hold point “

J

” for the height off the plat-

form. 

5

 

Removing glass 

5.1

 

Front glass 

 

Place the suction cups on the glass and 
slide frame ”

C

” upwards (fig. 3.0). 

 

See fig. 3.0, number: 

1

 

Slide the glass upwards to release the 
bottom from the frame. 

2

 

Now gently pull the bottom towards 
you. 

3

 

Take the exposed side towards you 
and place the glass in a safe place. 

 
For replacing the glass repeat the steps in reverse 
order. 

 

 

Please note! 

Avoid fingerprints on the glass, these are no 
longer removable once the fire is used. 

5.2

 

Side glass 

For cleaning only it’s not necessary to remove the 
side glass. 

 

Remove the front glass (see chapter 5.1). 

 

Remove the glass strip at the top (fig. 3.1 
and 3.2). 

 

Place a suction cup and remove the side 
glass (fig. 3.3). 

 

To do this, see fig. 3.3, number: 

1

 

Slide the glass upwards to release the 
bottom from the frame. 

2

 

Then pull the bottom towards you 
and place the flass in a safe place. 

 

For replacing the glass repeat the steps in reverse 
order. 

 

 

Please note! 

Avoid fingerprints on the glass, these are no 
longer removable once the fire is used. 

6

 

Placing decoration material 

It is not permitted to use other or to add more ma-
terial in the combustion chamber. 

 

See the supplied decoration instruction card or 
chapter 18: 

 

Divide the glass granulate on the perfo-
rated bottom plate. 

 

Place the 2 large wood blocks and make 
sure there is no glass granulate under-
neath. 

Содержание MatriX 450/500 III

Страница 1: ...Installation manual MatriX 450 500 III MatriX 450 650 III ENG 40011653 2017 ...

Страница 2: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 2 ...

Страница 3: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 3 ...

Страница 4: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 4 1 0 1 1 1 2 1 3 ...

Страница 5: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 5 1 4 2 0 2 1 2 2 F G Y X ...

Страница 6: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 6 2 3 2 4 2 5 2 6 2 7 H H I I J H H L K ...

Страница 7: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 7 2 8 2 9 ...

Страница 8: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 8 3 0 3 1 3 2 3 3 1 1 c 3 3 2 ...

Страница 9: ...structions Please note It is advisable to always install a screen for the fire place if children elderly or disabled people are present in the same room as the fireplace If regu larly vulnerable persons can be present in the room without supervision sufficient protection must always be placed around the fireplace This appliance must be installed according with the rules in force and used only in a...

Страница 10: ...T600 N1 D Vm L20040 O 50 Outlets fig 1 4 The balanced flue pipe for combined air supply and discharge can use a wall terminal or a roof termi nal Verify that the desired outlet meets the local regulations regarding pollution and ventilation openings Please note For proper functioning the outlet must at least be 0 5m away from Corners of the building Roof overhangs and balconies Roof edges with the...

Страница 11: ...pes under the appliance are not damaged Remove the glass and any mouldings store them at a safe place and remove the packaged parts from the fireplace Prepare the gas connection on the gas valve 4 5 Positioning the fireplace Take into account the installation requirements see chapter 3 Place the fireplace at the right place and level it Rough height adjustment With the adjustable optional legs Acc...

Страница 12: ...ve strips H and the spacers I see fig 2 4 and 2 7 Method II Installation WITHOUT the cover trim fig 2 3 Remove the distance profiles I see fig 2 4 Please note Make sure that the distance profile screws I are replaced at the front to ensure that the ap pliance is air tight Build the platform against the glass sup ports K and L see fig 2 6 Hold point J for the height off the plat form 5 Removing gla...

Страница 13: ...eakage Check ignition and burner Ignite the fireplace by using the remote control as described in the user manual and test all burner possibilities Check the ignition of the burner at high and small settings The ignition must be smooth and quiet 7 1 Checking the flame image Let the fireplace burn for at least 20 minutes at highest setting and check the flame for flame distribution colour of the fl...

Страница 14: ...provide the type and serial number of the appliance when ordering 11 Flue calculation A simple way to calculate whether the exhaust configuration is possible in combination with your fireplace use the Faber Flue App V2 This is available free of charge and can be down loaded via Internet Android and PC Windows Store Windows 10 App Store iPhone iPad and Mac Google Play Android smart phones and Andro...

Страница 15: ... elbows vertically off set less than 45 fig 12 1 B and D Pipes at an angle of inclination These are pipes vertically ascending at an angle of 30 or 45 fig 12 1 C Fill in only in combination with at least two 30 or 45 elbows in the vertical part Restrictor table See restrictor table for the correct vertical TVH and horizontal length THL In case of an X or if the values are outside the re strictor t...

Страница 16: ... 50 40 40 30 0 x x x x 9 60 50 50 50 40 30 30 x x x x 10 60 60 50 50 40 30 30 x x x x 11 60 60 60 50 40 40 30 x x x x 12 60 60 60 50 50 40 30 x x x x 13 60 60 60 50 50 40 30 x x x x 14 60 60 60 50 50 40 30 x x x x 15 60 60 60 50 50 40 30 x x x x 16 60 60 60 50 50 40 30 x x x x 17 60 60 60 50 50 40 30 x x x x 18 60 60 60 50 50 40 30 x x x x 19 60 60 60 50 50 40 30 x x x x 20 60 60 60 50 50 40 30 x ...

Страница 17: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 17 12 Examples flue materials ...

Страница 18: ...5m till 2m 1 5 Flue length 2m or more 2 Bend 90 0 1 Bend 45 30 or 15 0 2 Roof terminal 1 Wall terminal 0 Total Vertical Height TVH measured height rounded value meter meter Total Horizontal Length THL Calculation Part number x value result rounded value Total Length in meters x 1 90 Bend vertical to horizontal x 0 4 45 Bend vertical to horizontal x 0 2 90 Bend in horizontal direction x 1 5 45 Bend...

Страница 19: ...e X then the installation is not possible Solution Change the TVH or THL Results Restrictor size Value for the comma mm Extra information Value behind the comma mark Install the air restrictor plate see installation manual 0 1 Install adapter 100 150 direct on top of the fire 0 2 In case of wall terminal install adapter 100 150 before the last bend in case of roof terminal just before the terminal...

Страница 20: ... efficiency index EEI 90 90 90 Type heating output control room temperature no no no no no yes Glen Dimplex Benelux Saturnus 8 Heerenveen The Netherlands With mechanical control of the room temperature by thermostat Control of room temperature with open window detection no With electronic control of the room temperature With electronic control of the room temperature plus day time switch With opti...

Страница 21: ... Location Position outlet Distance mm D Under a gutter 500 E Under a roof edge 500 F Under a carport or balcony 500 G Vertical downpipe 300 H Inside and outside corners 500 J From wall surface to a wall outlet 1000 K Two gable outlets against over each other 1000 L Distance between two roof outlets 450 M Two roof outlets above each other on a pitched roof 1000 N Two gable outlets next to each othe...

Страница 22: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 22 16 Troubleshooting guide ...

Страница 23: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 23 ...

Страница 24: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 24 17 Dimensional drawings 17 1 MatriX 450 500 III ...

Страница 25: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 25 17 2 MatriX 450 650 III ...

Страница 26: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 26 17 3 Wall bracket MatriX 450 500 III and 450 650 III article number A9323296 ...

Страница 27: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 27 17 4 Remote access door article number A9299463 ...

Страница 28: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 28 17 5 Ventilation grid article number A9296400 ...

Страница 29: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 29 17 6 Adjustable feet article number A9319696 ...

Страница 30: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 30 18 Decoration instruction card ...

Страница 31: ...Installation manual Matrix 450 500 III and MatriX 450 650 III 31 ...

Страница 32: ...www faberfires com contact faberfires com Saturnus 8 NL 8448 CC Heerenveen Postbus 219 NL 8440 AE Heerenveen ...

Отзывы: