![Faber LEVANTE 1 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/faber/levante-1/levante-1_installation-instructions-use-and-care-information_3688436012.webp)
12
Remove the filters one at
a time by pushing them
towards the back of the
hood and pulling down at
the same time.
Remove the wiring box
cover by unscrewing
the 2 screws.
Preparing the hood for electrical knockouts
7" 1/2
13/16"
13/16"
Created by
Palazzi, Walter
Denomination
GENERAL ASSEMBLY
Lang
EN
Sheet
3 /3
Modif.by
Astolfi, Ilaria
Approved by
Approval date
Doc. status
Drawing N.
02B_710
Rev
01
CHOOSE VERTICAL OR HORIZONTAL
ELECTRICAL CONNECTION KNOCKOUT'S
1
2
Phillips Screwdriver
Содержание LEVANTE 1
Страница 6: ...6 RANGE HOOD DIMENSIONS 24 30 36...
Страница 7: ...7 MIN 24 OVER ELECTRIC MIN 30 OVER GAS Min 24 Min 30 INSTALLATION HEIGHT REQUIREMENTS...
Страница 37: ...37 DIMENSIONS DE LA HOTTE 24 30 36...
Страница 68: ...68 DIMENSIONES DE LA CAMPANA EXTRACTORA 24 30 36...
Страница 69: ...69 Min 24 Min 30 REQUISITOS DE ALTURA DE INSTALACI N M N 24 SOBRE PLACA EL CTRICA MIN 30 SOBRE PLACA DE GAS...
Страница 94: ...94...
Страница 95: ...95...
Страница 96: ...991 0602 698_01 200120 D00000525_00...