background image

Installation

 

Instructions

 

 

16 < 

<

 

<

 

<

 

 

14

 

 

Technical

 

data

  

Gas

 

cat.

 

 

II

 

2L3B/P

 

II

 

2EK3B/P

II

 

2E3B/P

II

 

2L3B/P

 

II

 

2L3B/P

 

II

 

2EK3B/P

 

II

 

2EK3B/P

 

II

 

2E3B/P

 

II

 

2E3B/P

Appliance

 

type

 

C11/C31/C91

 

C11/C31/C91

C11/C31/C91

C11/C31/C91

 

C11/C31/C91

Reference

 

gas

 

G25

 

G25.3

G20

G30

 

G31

Load

 

Hi

 

kW

7.9

 

8.1

7.9

7.4

 

7.4

Efficiency

 

class

 

2

 

2

2

2

 

2

NOX

  

5

 

5

5

5

 

5

Inlet

 

pressure

 

mbar

 

25

 

25

20

30

 

30

Gas

 

flow

 

rate

 

at

 

full

 

load

 

M3/h

 

0.932

 

0.956

 

0.836

 

0.253

 

0.253

 

(At

 

15°C

 

and

 

1013

 

mbar)

 

gr/h

 

‐ 

‐ 

‐ 

480

 

480

 

Burner

 

pressure

 

at

 

full

 

load

 

mbar

 

16

 

16

 

11

 

25

 

25

 

Nozzle

 

main

 

burner

 

mm

 

Middle

 

390

 

Side

 

360

 

Middle

 

390

Side

 

360

 

Middle

 

390

Side

 

360

 

ST

 

1.04

 

ST

 

1.04

 

Low

 

flow

 

rate

 

mm

1.8

 

1.8

1.8

1.3

 

1.3

Pilot

 

light

 

SIT145

 

SIT145

SIT145

SIT145

 

SIT145

Nozzle

 

code

 

No.

 

36

 

No.

 

36

No.

 

36

No.

 

23

 

No.

 

23

Diameter

 

exhaust/supply

 

mm

 

130/200

 

130/200

 

130/200

 

130/200

 

130/200

 

Gas

 

control

 

valve

 

GV60

 

GV60

GV60

GV60

 

GV60

Gas

 

connection

 

3/8”

 

3/8”

3/8”

3/8”

 

3/8”

Power

 

V

220

 

220

220

220

 

220

Batteries

 

receiver

 

V

4x

 

AA

 

4x

 

AA

4x

 

AA

4x

 

AA

 

4x

 

AA

Batteries

 

transmitter

 

V

 

9

 

9

 

9

 

9

 

9

 

 
 

Содержание 40010959-1440

Страница 1: ...Relaxed Premium M 40010959 1440 Relaxed Premium M ENG ...

Страница 2: ...Installation Instructions 1 3 alternative finishes 1 1a 1 1b 1 1c ...

Страница 3: ...Installation Instructions 2 1 2 1 3 1 4 7 ...

Страница 4: ...Installation Instructions 3 1 9 1 5 1 6 B ...

Страница 5: ...Installation Instructions 4 2 1 2 2 2 3 3 1 3 2 3 3 3 4 ...

Страница 6: ...Installation Instructions 5 3 5 4 1 4 2 4 3 ...

Страница 7: ...e and heating purposes This means that all surfaces including the glass can be very hot over 100 C exceptions to this are the bottom of the fire and the control elements Do not place any combustible materials within 0 5 m of the radiation area of the fire Light the fire for the first time and run for several hours on the highest setting so that the paint can cure Provide adequate ventilation so th...

Страница 8: ...30mm with CE marking for 600 C Please note The minimum chimney diameter for a 130mm flexible stainless steel pipe must 200 x 200mm And for a 100mm flexible stainless steel pipe 150x150mm 4 Preparation and installation instructions 4 1 Gas connection The gas connection must comply with the applicable local standards We advise using a Ø 15mm gas connection directly from the gas meter to the applianc...

Страница 9: ...ngs Fig 1 2 C Spacer Fig 1 2 D F and H Fig 1 3 Please note Ensure that the fire is not load bearing with regard to the false chimney breast See the dimensional drawing Chapter 18 1 Pay special attention to the following points 1 Check during work if the glass can be inserted and removed 2 Check during work if the mouldings B Fig 1 2 or Q Fig 1 5 match 4 6 4 Method 1 Fig 1 1a Build the false chimne...

Страница 10: ...e ignition of the main burner on full and small setting ignition must be smooth and quiet 7 2 Checking for gas leaks Check with a gas leak finder or spray all connections and pipes for gas leakage 7 3 Checking the burner pressure and primary pressure Check that the burner pressure and primary pressure match the information listed in the manual Chapter 14 Technical specifications Measuring the prim...

Страница 11: ...mber o The glass o The logs for breakage o The outlet Replace if necessary o Chips Embers Glow wire 9 2 Cleaning the glass Most deposits can be removed with a dry cloth Clean the glass with a ceramic hob cleaner Please note Avoid fingerprints on the glass These are no longer removable after they are burnt in Now carry out check up as described in Chapter 7 Checking after installation 10 Conversion...

Страница 12: ...zontal bends are bends which are entirely in the horizontal plane Bends Elbows 90 vertical to horizontal plane These are 90 elbows which proceed from horizontal to vertical Fig 12 2 and 12 3 G O and S Bends 45 or 30 vertical to horizontal plane These are 30 or 45 bends with a vertical offset of less than 45 Fig 12 1 B and D Pipes under a tilt angle These are pipes which are vertically ascending at...

Страница 13: ...50 50 50 40 40 30 x x x x 10 60 60 50 50 50 40 30 x x x x 11 60 60 60 50 50 40 30 x x x x 12 65 60 60 50 50 40 30 x x x x 13 65 60 60 50 50 40 30 x x x x 14 65 60 60 50 50 40 30 x x x x 15 65 60 60 50 50 40 30 x x x x 16 65 60 60 50 50 40 30 x x x x 17 65 60 60 50 50 40 30 x x x x 18 65 60 60 50 50 40 30 x x x x 19 65 60 60 50 50 40 30 x x x x 20 65 60 60 50 50 40 30 x x x x 21 65 60 60 50 50 40 3...

Страница 14: ...Installation Instructions 13 12 Example Fig 12 1 Fig 12 2 Fig 12 3 ...

Страница 15: ...Installation Instructions 14 13 Calculation Sheet ...

Страница 16: ...Installation Instructions 15 ...

Страница 17: ...h 0 932 0 956 0 836 0 253 0 253 At 15 C and 1013 mbar gr h 480 480 Burner pressure at full load mbar 16 16 11 25 25 Nozzle main burner mm Middle 390 Side 360 Middle 390 Side 360 Middle 390 Side 360 ST 1 04 ST 1 04 Low flow rate mm 1 8 1 8 1 8 1 3 1 3 Pilot light SIT145 SIT145 SIT145 SIT145 SIT145 Nozzle code No 36 No 36 No 36 No 23 No 23 Diameter exhaust supply mm 130 200 130 200 130 200 130 200 1...

Страница 18: ... Distance mm D Under a gutter 500 E Under a roof edge 500 F Under a carport or balcony 500 G Vertical downpipe 300 H Inside and outside corners 500 J From wall surface to a wall outlet 1000 K Two gable outlets against over each other 1000 L Distance between two roof outlets 450 M Two roof outlets above each other on a pitched roof 1000 N Two gable outlets next to each other 1000 Short roof termina...

Страница 19: ...Installation Instructions 18 16 Dimensional drawings 16 1 Relaxed Premium M 834 Ext Build in opening 348 Ext 460 max 110 min ...

Страница 20: ...Installation Instructions 19 16 2 Ventilation grid and control door ...

Страница 21: ...Installation Instructions 20 ...

Страница 22: ...Installation Instructions 21 ...

Страница 23: ...Installation Instructions 22 ...

Страница 24: ...Dealer info ...

Отзывы: