background image

Installation

 

Instructions

 

 

8 < 

<

 

<

 

<

 

 

Build

 

the

 

system

 

from

 

the

 

fire.

 

If

 

this

 

is

 

not

 

possible

 

you

 

can

 

make

 

use

 

of

 

an

 

extendable

 

adapter

 

section.

 

 

For

 

truing

 

up

 

the

 

exhaust

 

system

 

use

 

the

 

½

 

meter

 

pipe,

 

which

 

can

 

be

 

shortened

 

and

 

ensure

 

that

 

the

 

inner

 

pipe

 

is

 

always

 

2cm

 

longer

 

than

 

the

 

outer

 

pipe.

 

 

Parts,

 

which

 

are

 

shortened,

 

must

 

be

 

secured

 

with

 

a

 

self

tapping

 

screw

 

 

Wall

 

and

 

roof

 

terminals

 

can

 

also

 

be

 

cut.

 

 

Do

 

not

 

insulate

 

but

 

ventilate

 

built

in

 

flue

 

material.

 

(approx.

 

100cm2).

 

4.6

 

Constructing

 

the

 

false

 

chimney

 

If

 

possible,

 

carry

 

out

 

a

 

performance

 

test

 

at

 

the

 

fire

 

before

 

finally

 

finishing

 

the

 

installation.

 

 

4.6.1

 

Minimum

 

false

 

chimney

 

size

 

and

 

distance

 

to

 

combustible

 

materials

 

Construct

 

the

 

false

 

chimney

 

of

 

non

combustible

 

material

 

in

 

combination

 

with

 

metal

 

profiles

 

or

 

of

 

masonry/concrete

 

blocks.

  

Always

 

use

 

a

 

lintel

 

or

 

reinforcing

 

bars

 

while

 

bricking

 

the

 

outlet.

 

They

 

should

 

not

 

be

 

placed

 

directly

 

on

 

the

 

fire.

 

4.6.2

 

Ventilation

 

The

 

ventilation

 

must

 

comply

 

with

 

the

 

applicable

 

local

 

standards.

 

Correct

 

ventilation

 

prevents

 

a

 

too

 

high

 

temperature

 

of

 

the

 

gas

 

regulator

 

block

 

and

 

its

 

electronics

 

and

 

also

 

limits

 

the

 

temperature

 

of

 

the

 

convection

 

air.

 

Therefore

 

plan

 

for

 

outlet

 

of

 

grills

 

and

 

a

 

ventilating

 

control

 

hatch

 

with

 

a

 

minimum

 

free

 

passage

 

of

 

200cm

2

 

per

 

grid

 

or

 

a

 

similar

 

alternative.

 

Place

 

above

 

the

 

grates

 

a

 

screen

 

plate

 

made

 

of

 

non

combustible

 

material.

 

(see

 

Fig.

 

1.9A)

 

4.6.3

 

  

Installation

 

and

 

finishing

 

For

 

installation

 

and

 

finishing

 

the

 

following

 

points

 

are

 

of

 

interest:

  

 

A

 

=

 

Fixing

 

points

 

(Fig.

 

1.2).

 

B

 

=

 

Mouldings

 

(Fig.

 

1.2).

 

C

 

=

 

Spacer

 

(Fig.

 

1.2)

 

 

D,

 

F

 

and

 

H

 

(Fig.

 

1.3).

 

 

 

Please

 

note:

 

Ensure

 

that

 

the

 

fire

 

is

 

not

 

load

bearing

 

with

 

regard

 

to

 

the

 

false

 

chimney

 

breast

 

.

 

(See

 

the

 

dimensional

 

drawing

 

Chapter

 

18.1).

 

 

Pay

 

special

 

attention

 

to

 

the

 

following

 

points:

 

1.

 

Check

 

during

 

work

 

if

 

the

 

glass

 

can

 

be

 

inserted

 

and

 

removed.

 

2.

 

Check

 

during

 

work

 

if

 

the

 

mouldings

 

B

 

(Fig.

 

1.2)

 

or

 

Q

 

(Fig.

 

1.5)

 

match.

  

4.6.4

 

Method

 

1

 

(Fig.

 

1.1a)

 

Build

 

the

 

false

 

chimney

 

breast

 

against

 

the

 

fixing

 

points

 

A

 

(Fig.

 

1.2).

 

The

 

installation

 

must

 

always

 

for

 

installing

 

and

 

removing

 

the

 

glass!

 

 

Take

 

into

 

account

 

the

 

thickness

 

of

 

the

 

finish!

 

 

Spacer

 

C

 

is

 

in

 

line

 

with

 

the

 

top

 

of

 

the

 

glass

 

slot

 

H

 

(line

 

F

)

 

(Fig.

 

1.3).

 

 

Do

 

not

 

use

 

spacer

 

C

 

as

 

a

 

supporting

 

structure.

  

 

Remove

 

the

 

fixing

 

points

 

(

A

)

 

on

 

the

 

side

 

wall

 

before

 

the

 

outlet

 

wall

 

is

 

finally

 

finished!

 

(Fig.

 

1.4).

 

4.6.5

 

Method

 

2

 

(Fig.

 

1.1b)

 

Process

 

see

 

Chapter

 

4.6.3

 

4.6.6

 

Method

 

3

 

(Fig.

 

1.1c)

 

Remove

 

the

 

spacer

 

C

 

(Fig.

 

1.5).

 

To

 

ensure

 

the

 

air

tightness

 

of

 

the

 

unit

 

the

 

screws

 

must

 

be

 

replaced.

  

 

The

 

base

 

X

 

(Fig.

 

1.5)

 

must

 

be

 

2mm

 

clear

 

of

 

the

 

spacer

 

R

 

(Fig.

 

1.5)

 

and

 

4mm

 

above

 

the

 

glass

 

slot

 

H

 

of

 

the

 

unit

 

(Fig.

 

1.5).

 

This

 

will

 

allow

 

the

 

moulding

 

Q

 

(Fig.

 

1.5)

 

to

 

be

 

on

 

the

 

same

 

level

 

as

 

the

 

base.

  

4.6.7

 

Mounting

 

the

 

mouldings.

 

 

First,

 

place

 

the

 

bottom

 

moulding.

 

 

Then

 

place

 

the

 

left

 

and

 

right

 

mouldings

 

(

these

 

are

 

fixed

 

by

 

the

 

adjustable

 

magnetic

 

snappers)

 

 

Attach

 

the

 

upper

 

moulding

 

and

 

secure

 

it

 

with

 

the

 

3

 

Torx

 

screws.

 

(See

 

Fig.

 

1.2

 

B)

  

 

Remove

 

the

 

bottom

 

mouldings

 

using

 

the

 

supplied

 

magnetic

 

knob

 

(Fig.

 

1.8).

 

5

 

Removing

 

the

 

glass

  

 

Remove

 

the

 

mouldings,

 

see

 

Chapter

 

4.6.6

  

 

Place

 

the

 

suction

 

cups

 

on

 

the

 

glass.

  

 

Draw

 

the

 

sealing

 

cord

 

from

 

the

 

slot.

 

(Fig.

 

2.1).

 

 

Slide

 

the

 

glass

 

to

 

the

 

top

 

so

 

that

 

the

 

bottom

 

is

 

released

 

from

 

the

 

slot.

 

Now

 

pull

 

the

 

glass

 

out

 

and

 

gradually

 

down.

 

(Fig.

 

2.3).

 

Содержание 40010959-1440

Страница 1: ...Relaxed Premium M 40010959 1440 Relaxed Premium M ENG ...

Страница 2: ...Installation Instructions 1 3 alternative finishes 1 1a 1 1b 1 1c ...

Страница 3: ...Installation Instructions 2 1 2 1 3 1 4 7 ...

Страница 4: ...Installation Instructions 3 1 9 1 5 1 6 B ...

Страница 5: ...Installation Instructions 4 2 1 2 2 2 3 3 1 3 2 3 3 3 4 ...

Страница 6: ...Installation Instructions 5 3 5 4 1 4 2 4 3 ...

Страница 7: ...e and heating purposes This means that all surfaces including the glass can be very hot over 100 C exceptions to this are the bottom of the fire and the control elements Do not place any combustible materials within 0 5 m of the radiation area of the fire Light the fire for the first time and run for several hours on the highest setting so that the paint can cure Provide adequate ventilation so th...

Страница 8: ...30mm with CE marking for 600 C Please note The minimum chimney diameter for a 130mm flexible stainless steel pipe must 200 x 200mm And for a 100mm flexible stainless steel pipe 150x150mm 4 Preparation and installation instructions 4 1 Gas connection The gas connection must comply with the applicable local standards We advise using a Ø 15mm gas connection directly from the gas meter to the applianc...

Страница 9: ...ngs Fig 1 2 C Spacer Fig 1 2 D F and H Fig 1 3 Please note Ensure that the fire is not load bearing with regard to the false chimney breast See the dimensional drawing Chapter 18 1 Pay special attention to the following points 1 Check during work if the glass can be inserted and removed 2 Check during work if the mouldings B Fig 1 2 or Q Fig 1 5 match 4 6 4 Method 1 Fig 1 1a Build the false chimne...

Страница 10: ...e ignition of the main burner on full and small setting ignition must be smooth and quiet 7 2 Checking for gas leaks Check with a gas leak finder or spray all connections and pipes for gas leakage 7 3 Checking the burner pressure and primary pressure Check that the burner pressure and primary pressure match the information listed in the manual Chapter 14 Technical specifications Measuring the prim...

Страница 11: ...mber o The glass o The logs for breakage o The outlet Replace if necessary o Chips Embers Glow wire 9 2 Cleaning the glass Most deposits can be removed with a dry cloth Clean the glass with a ceramic hob cleaner Please note Avoid fingerprints on the glass These are no longer removable after they are burnt in Now carry out check up as described in Chapter 7 Checking after installation 10 Conversion...

Страница 12: ...zontal bends are bends which are entirely in the horizontal plane Bends Elbows 90 vertical to horizontal plane These are 90 elbows which proceed from horizontal to vertical Fig 12 2 and 12 3 G O and S Bends 45 or 30 vertical to horizontal plane These are 30 or 45 bends with a vertical offset of less than 45 Fig 12 1 B and D Pipes under a tilt angle These are pipes which are vertically ascending at...

Страница 13: ...50 50 50 40 40 30 x x x x 10 60 60 50 50 50 40 30 x x x x 11 60 60 60 50 50 40 30 x x x x 12 65 60 60 50 50 40 30 x x x x 13 65 60 60 50 50 40 30 x x x x 14 65 60 60 50 50 40 30 x x x x 15 65 60 60 50 50 40 30 x x x x 16 65 60 60 50 50 40 30 x x x x 17 65 60 60 50 50 40 30 x x x x 18 65 60 60 50 50 40 30 x x x x 19 65 60 60 50 50 40 30 x x x x 20 65 60 60 50 50 40 30 x x x x 21 65 60 60 50 50 40 3...

Страница 14: ...Installation Instructions 13 12 Example Fig 12 1 Fig 12 2 Fig 12 3 ...

Страница 15: ...Installation Instructions 14 13 Calculation Sheet ...

Страница 16: ...Installation Instructions 15 ...

Страница 17: ...h 0 932 0 956 0 836 0 253 0 253 At 15 C and 1013 mbar gr h 480 480 Burner pressure at full load mbar 16 16 11 25 25 Nozzle main burner mm Middle 390 Side 360 Middle 390 Side 360 Middle 390 Side 360 ST 1 04 ST 1 04 Low flow rate mm 1 8 1 8 1 8 1 3 1 3 Pilot light SIT145 SIT145 SIT145 SIT145 SIT145 Nozzle code No 36 No 36 No 36 No 23 No 23 Diameter exhaust supply mm 130 200 130 200 130 200 130 200 1...

Страница 18: ... Distance mm D Under a gutter 500 E Under a roof edge 500 F Under a carport or balcony 500 G Vertical downpipe 300 H Inside and outside corners 500 J From wall surface to a wall outlet 1000 K Two gable outlets against over each other 1000 L Distance between two roof outlets 450 M Two roof outlets above each other on a pitched roof 1000 N Two gable outlets next to each other 1000 Short roof termina...

Страница 19: ...Installation Instructions 18 16 Dimensional drawings 16 1 Relaxed Premium M 834 Ext Build in opening 348 Ext 460 max 110 min ...

Страница 20: ...Installation Instructions 19 16 2 Ventilation grid and control door ...

Страница 21: ...Installation Instructions 20 ...

Страница 22: ...Installation Instructions 21 ...

Страница 23: ...Installation Instructions 22 ...

Страница 24: ...Dealer info ...

Отзывы: