Page | 1
Installation Sequence ........................................................................................................................................................ 2
Key Components of E124 Board ....................................................................................................................................... 3
Description of Key Components ................................................................................................................................... 3
Electrical Connections ................................................................................................................................................... 3
Connection of Traditional Photocells ............................................................................................................................ 3
Connection of FAAC BUS 2Easy Photocells ................................................................................................................... 4
Connection of FAAC BUS 2easy Safecoders and S800 Encoders .................................................................................. 4
Verification of BUS 2easy Connections on J10 Terminal .............................................................................................. 5
E124 Control Board Programming .................................................................................................................................... 5
Basic Programming and Time Learning (Setup) ............................................................................................................ 5
Advanced Programming useful functions ..................................................................................................................... 9
Signalling Errors and Alarms ........................................................................................................................................... 10
Programming Remote Controls using the XF Receiver and OmniDec ............................................................................ 11
Programming a new remote control to a new E124 System ...................................................................................... 11
Programming a new remote control from a working master remote control ........................................................... 11
Tutorial Videos available for programming remote controls ..................................................................................... 11
Please ensure that the correct cabling has been installed prior to commissioning of the system, as incorrect
cabling can prevent the unit from operating correctly immediately or after installation.
BUS-2EASY ENCODER and PHOTOCELLS Cable Specification: 2 core 0.5mm2 Multi-Strand Shielded Cable with the
Sheath connected to the Earth at one end. Please do not share BUS-2EASY devices with other DC Voltage devices
as it leads to electrical noise causing interference with the digital data on BUS-2EASY.
Motor Cable Specification: Minimum 2 core 2.5mm2 Multi-Strand Cable for a recommended distance of 10mtrs,
further distances are possible but will require thicker cable.
These instructions are to be considered as a rapid guide for installation and to confirm the correct handing and
polarity of the motors. They can also be used to confirm the operating logics before additional safety devices are
fitted to the system as specified by the Risk Assessment undertaken by the installer. The installer should still
familiarise themselves with the full manual and the safety information contained within. (available at
https://www.faac.co.uk/accessories-and-control-boards/control-boards/for-swing-gates/e124-control-board)
Содержание E124
Страница 1: ...E124 Quick Start Guide...
Страница 11: ...Page 10 Signalling Errors and Alarms...