![FAAC E124 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/faac/e124/e124_original-instructions-manual_3115894039.webp)
E124 37
532365 - Rev.A
Tr
ansla
tion of the orig
inal instruc
tions
ENGLISH
9. MAINTENANCE
RISKS
PERSONAL PROTECTIVE EQUIPMENT
9.1 ROUTINE MAINTENANCE
The table
lists the operations that should be per-
formed on a regular basis on the E124 board in order
to keep the automation working reliably and safely;
these are given purely as a guideline and should not
be considered exhaustive. The installer/machine
manufacturer is responsible for drawing up the main-
tenance plan for the automation, supplementing this
list or modifying the maintenance intervals according
to the machine characteristics.
F
Always shut off the power supply before performing
any maintenance operations. If the power disconnect
switch is not in view, place a “WARNING - Maintenance
in Progress” sign on it. Restore the power supply only
after finishing any maintenance work and restoring the
area to normal.
!
Maintenance must be performed by the installer or a
maintenance technician.
Follow all safety recommendations and instructions
given in this manual.
Mark off the work site and prohibit access/transit. Do
not leave the work site unattended.
The work area must be kept tidy and clear upon complet-
ing maintenance.
Before starting work, wait for any hot components to
cool down.
Do not make any modifications to the original com-
ponents.
FAAC S.p.A. shall bear no liability for damage or injury
due to components that have been modified or otherwise
tampered with.
L
The warranty shall be forfeited in the event of tampering
with components.
Only use original FAAC spare parts.
9
Scheduled maintenance
Operations
Frequency (months)
Electronic equipment
Check the condition of the electronic
board enclosure, the power cables, the connection cables, the
cable glands and the junction boxes and the plastic board
protection covers.
Check that the connectors and wiring are intact. Check that
there are no signs of overheating, burning etc. of electronic
components.
Check that the earth connections are intact and that the
circuit breaker and differential switch are working correctly.
12
Check that the encoders operate correctly when an obstacle
is detected.
6
Control devices
Check that the installed control devices and
radio controls are in good condition and that they operate
correctly.
12
Emergency batteries
Check that the automation works
correctly when operating on battery.
12
Sensitive edges
Check that the sensitive edges operate
correctly when an obstacle is detected.
6
Photocells
heck that each pair of photocells is working
correctly. Check that there is no optical/light interference
between the pairs of photocells.
6
Indicator light devices
Check that they are properly
fastened, intact and operating correctly.
12
Electric locks
Check that they are properly fastened, intact
and operating correctly. Clean the seats.
12
Access control
Check that the gate opens only when an
authorised user is recognised.
12
Complete automation system
Check that the
automation system operates correctly, according to the set
parameters, when using the various control devices.
Check that the gate moves correctly - smooth, regular and
without abnormal noise.
Check that both the opening and closing speed are correct
and that the stop positions and slow-downs provided for
are respected.
Check that the limit switch is intact and that it operates
correctly.
Check that all the connected devices are operating correctly
in addition to those in the list.
Check that the maximum force required to move the leaf
manually is less than 225 N in residential areas and 260 N
in industrial or commercial areas.
Check the force limitation curve (standard EN 12453). For
non-EU countries, of there are no specific local regulations,
the force must be less than 150 N.
6
Содержание E124
Страница 1: ...E124 Translation of the original instructions...
Страница 43: ......