![F5 i2000 Series Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/f5/i2000-series/i2000-series_platform-manual_535215028.webp)
Note: The default baud rate and serial port configuration is 19200/8-N-1.
• Connect the RJ45F to RJ45M rolled serial adapter to the console port if you are connecting the
system to a serial console server with a standard CAT5 cable, and then connect the CAT5 cable to
the adapter. The adapter provides the appropriate pinout connection to your equipment. For
information about cable and connector pinout specifications, see
F5 Platforms: Accessories
at
support.f5.com/kb/en-us/products/big-ip_ltm/manuals/product/f5-plat-
accessories.html
.
Figure 7: The RJ45F to RJ45M rolled serial (pass-through) adapter (CBL-0143-00)
3.
Connect power to installed power supplies:
Note: Be sure to route the power cords away from the fan tray so that the cords do not impede access
to it.
• For AC-powered systems, connect an auto locking power cable to the power input panel on all
installed power supplies, and then connect the cable to the power source.
Note: Not all country-specific power cables include a locking feature.
Note: To remove the locking power cord, pull one or both of the power cord locking tabs away
from the power supply.
• For DC-powered systems, connect a DC cable to each power supply and then connect the cable to
your DC mains power source.
4.
If you plan to set up device service clustering (DSC
®
) with hard-wired failover capacity, connect the
serial failover cable to the FAILOVER port on each unit.
For more information about configuring failover, see
BIG-IP
®
Device Service Clustering:
Administration
at
support.f5.com
.
You can now assign a management IP address to the system, and then license and provision the software.
Optionally, you should run the
QKView
utility. This utility collects configuration and diagnostic
information about your system into a single file that you can provide to F5 Technical Support to aid in
troubleshooting. For more information, see
support.f5.com/csp/article/K12878
.
Platform Installation
28
Содержание i2000 Series
Страница 1: ...Platform Guide i2000 i4000 Series MAN 0640 02 ...
Страница 2: ......
Страница 24: ...Platform Overview 24 ...
Страница 42: ...Figure 11 Rack mounting spatial requirements for the i2000 i4000 Series platform Environmental Guidelines 42 ...
Страница 46: ...Figure 14 Airflow in iSeries platforms Environmental Guidelines 46 ...
Страница 54: ...Repackaging Guidelines 54 ...