Page | 5
1.
UNCRATING
1.1
Remove banding from Platform Box and Gate Box (if included) and remove from pallet (FIG. 1.1) and set aside
1.2
Before continuing, see FIGs. 1.1, 1.2, and 1.3. Remove, open, and read installation instructions.
1.3
From inside the VPL tower remove the following and set aside:
1.3.1
4 Tower Panels (panels are labeled on back with blue tape; Panel 1, Panel 2, Panel 3, Panel 4)
1.3.2
Bracing and Bracing Hardware
1.3.3
Guard Ramp Activating Bar
1.3.4
Hardware Bag
1.3.5
Batteries (battery box contains battery hold down kit)
1.3.6
Guard Ramp Activating Bar
1.3.7
Zip Ties from Control Box
1.3.8
Support Channel Shipping Brace
1.3.9
Zip Ties and Foam (under Drive Screw)
1.3.10
Shipping Lag Bolts and Washers
Do not attempt to lift VPL from pallet until all shipping lag bolts have been removed. Damage will
occur and a dangerous situation may result.
Do not remove the VPL from the shipping pallet unless you have the proper bracing ready for
installation.
FIG. 1.1
Содержание PASSPORT PL120SP3651
Страница 6: ...Page 6 FIG 1 2 FIG 1 3...
Страница 9: ...Page 9 FIG 3 2 FIG 3 3 FIG 3 4...
Страница 20: ...Page 20 FIG 8 1 FIG 8 2...