VPL must be anchored to a concrete slab and braced to a proper structure before operating the VPL while it is 
occupied. 

 

Maintaining all labels and manuals in legible condition is required by the VPL owner and is essential for safe VPL 
operation. The VPL comes with various product safety labels. Do not remove safety labels. If any labels are missing, 
damaged or become illegible they must be replaced. An illegible label will fail to alert individuals on or around the 
VPL of a procedure or hazardous operating conditions. Contact your dealer for additional information, replacement 
labels and manuals or to schedule inspections, repairs or service. 

 

When not servicing the VPL, keep all panels and protective coverings in place. 

 

The VPL warranty is not transferable. 

 

Using this VPL for anything other than its intended purpose will void the warranty. 

 

Attempting to tamper with or modify any portion of the VPL will void your warranty. 

 

Caustics, high alkaline detergents and solutions should not be used to clean aluminum. 

 

REQUIRED TOOLS 

 

 

3/8” or 1/2" Drive Ratchet 

 

Standard Phillips Screwdriver 

 

1/4” Open/Box End Wrench or Socket 

 

Standard Flat Screwdriver 

 

1/2” Open/Box End Wrench or Socket 

 

Pencil or Similar Marker 

 

7/16” Open/Box End Wrench or Socket 

 

1/8” Allen Wrench 

 

9/16” /Box End Wrench or Socket 

 

7/32” Allen Wrench 

 

Adjustable Crescent Wrench 

 

3/16” Allen Wrench 

 

13/64” or #7 Drill Bit 

 

Hammer Drill w/ Bit for Concrete Anchor 

 

TOOLS YOU MAY FIND USEFUL 

 

 

Utility Knife 

 

Needle Nose Pliers 

 

Torpedo Level 

 

Blade Style Fuse Puller 

 

Tape Measure 

 

Torque Wrench 

 

Rubber Mallet 

 

C-Clamps 

 

Side Cutting Pliers 

 

Vise Grip Pliers 

 

Adjustable Crescent Wrench 

 

Plumb Bob 

 

Digital Multimeter (DVM) 

 

Spare 5 Amp Blade Style Fuses 

 

Plumb Bob 

 

12” Long Piece of 12AWG Jumper Wire 

 

 

 

Содержание PASSPORT PL120SP3651

Страница 1: ...are proprietary and may not be shared modified distributed reproduced or reused without the express written permission of EZ ACCESS 18798 REV 06 27 19 PASSPORT Vertical Platform Lift VPL Installation...

Страница 2: ...ge and or failure property damage risk of serious bodily injury and or death to operators riders and those nearby the symbol may appear in various colors and in conjunction with other symbols The NOTE...

Страница 3: ...materials from VPL and landings before each use Inspect VPL for damaged missing or inoperable parts before each use Never use a damaged or unstable VPL Regularly check all fasteners and verify all nu...

Страница 4: ...sing this VPL for anything other than its intended purpose will void the warranty Attempting to tamper with or modify any portion of the VPL will void your warranty Caustics high alkaline detergents a...

Страница 5: ...1 3 2 Bracing and Bracing Hardware 1 3 3 Guard Ramp Activating Bar 1 3 4 Hardware Bag 1 3 5 Batteries battery box contains battery hold down kit 1 3 6 Guard Ramp Activating Bar 1 3 7 Zip Ties from Con...

Страница 6: ...Page 6 FIG 1 2 FIG 1 3...

Страница 7: ...ntended platform for the guard ramp to operate correctly The 90 Turn Platform Guard Ramp Activating Bar extends further from the tower than the Straight Platform Guard Ramp Activating Bar The extensio...

Страница 8: ...ten until washer is in contact with the bottom of the Power Head Mounting Plate then turn another quarter turn Properly tightened Battery Hold Down will allow slight twisting movement with fingers FIG...

Страница 9: ...Page 9 FIG 3 2 FIG 3 3 FIG 3 4...

Страница 10: ...3 5 3 2 3 Connect the splitter with the 2 black wires one 10AWG and one 16AWG to the Negative terminal of Battery 2 FIG 3 5 3 2 4 Connect opposite end of black 10AWG to Battery 1 Positive terminal FIG...

Страница 11: ...ting shackles 4 2 Use shackle holes and proper lifting equipment to lift the VPL into place Professional installation is required Anchor the VPL to concrete pad once it is lifted into place Refer to y...

Страница 12: ...raced Refer to your PASSPORT Vertical Platform Lift VPL Installation Manual for additional anchoring information Do not remove the VPL from the shipping pallet unless you have the proper bracing ready...

Страница 13: ...med bracing is undamaged set bracing in place and hold with clamps ensuring a dimensionally and structurally sound fit between VPL and vertical structure 5 1 1 3 Always mount bracing to VPL first see...

Страница 14: ...Page 14 10 VPL WITH BACK BRACE ADJUSTMENT RANGE WALL OR STRUCTURE 10 TO 24 BEHIND VPL FIG 5 4 FIG 5 5 DETAIL A SHOWN FIG 5 6 DETAIL B SHOWN...

Страница 15: ...ionally and structurally sound fit between VPL and vertical structure 5 1 2 3 Always mount bracing to VPL first see FIGs 5 7 through 5 10 before attaching to vertical structure To provide maximum flex...

Страница 16: ...Page 16 10 VPL WITH SIDE BRACE ADJUSTMENT RANGE WALL OR STRUCTURE 0 TO 3 BEHIND VPL FIG 5 8 FIG 5 9 DETAIL C SHOWN FIG 5 10 DETAIL D SHOWN...

Страница 17: ...NT FIG 5 14 120 w SIDE BRACE ISOMETRIC BACK 144 PASSPORT VERTICAL PLATFORM LIFT FIG 5 15 144 w BACK BRACE ISOMETRIC FRONT FIG 5 16 144 w BACK BRACE ISOMETRIC BACK FIG 5 17 144 w SIDE BRACE ISOMETRIC F...

Страница 18: ...VPL control circuit energized The VPL is electrically active in this state and will operate if the control buttons are pressed if the control circuit is inadvertently jumpered 7 4 When servicing the V...

Страница 19: ...p of the platform guard end post Flush the outside edge of the hinge with the outside edge of the platform guard end post FIG 8 1 8 5 Once gate and hinges are positioned you can attach the gate in one...

Страница 20: ...Page 20 FIG 8 1 FIG 8 2...

Страница 21: ...enever working with panels 10 1 There are 4 panels each labeled on the back as Panel 1 Panel 2 Panel 3 and Panel 4 10 1 1 REAR TOWER PANEL INSTALLATION 10 1 1 1 Follow FIG 10 1 installation instructio...

Страница 22: ...a final functional test Refer to your PASSPORT Vertical Platform Lift VPL Installation Manual for additional information on final testing procedures 11 2 If you have any questions please refer to your...

Отзывы: