YCS 100 • Installation and Operation
Installation and Operation, cont’d
2-16
YCS 100
Figure 2-15 — Jumper on YCS 100 internal board
N
When the YCS is delivered from the factory, a shunt is
attached to one prong of the jumper. This shunt is used
to enable the jumper in step
4
.
4
.
Enable (close) the CR8 jumper by placing the shunt on both
prongs, as shown below.
Open
Closed
Figure 2-16 — Enabling the CR8 jumper
5
.
Replace the YCS cover, using the screws that you removed.
6
.
Connect and power on all attached devices, then power on
the YCS 100.
A
Appendix A
Specifi cations, Part Numbers,
and Accessories
Specifi cations
Included Parts
Accessories