background image

14

NBP 1200C • Setup Guide (Continued)

© 2019 Extron Electronics   All rights reserved.  

www.extron.com

  All trademarks mentioned are the property of their respective owners.

Worldwide Headquarters:

 Extron USA West, 1025 E. Ball Road, Anaheim, CA 92805, 800.633.9876

68-3267-5

3

, Rev. A

12 19

Overall Configuration Procedure

Configure the IP settings

 of each NBP 

and of the control processor or receiver.

See the 

network 

communication 

setup instructions

Create a new GC Professional or GC Plus project 

and add the control processor or receiver to it.

Configure ports.

Add NBP button panels and configure the buttons.

Test the system, make adjustments, 

finalize configuration.

Save the project.

Cable the NBPs and the control processor or HCR receiver, 

then apply power.

Cable all devices.

Prepare the installation site.

Get ready.

Change buttons or faceplates, if desired

Mount the NBPs.

Create monitors, schedules, timers, macros, 

and local variables.

Build and upload the configuration to 

the controller or receiver.

If desired or required, install a new 

security certificate (via Toolbelt).

Within Global Configurator 
(GC Professional or 
GC Plus mode):

Figure 15. 

Overall Configuration Steps

network 

communication 

setup instructions

 

on page 10.

For information on safety guidelines, regulatory compliances, EMI/EMF compatibility, accessibility, and related topics, see the 

Extron Safety and Regulatory Compliance Guide

 on the Extron website.

Содержание NBP 1200C

Страница 1: ...NBP 1200C and Other Devices in the System Step 10 Set up the NBP for Network Communication Step 11 Configure the System Step 12 Test and Troubleshoot Step 1 Get Ready Preparation checklist Use the fol...

Страница 2: ...ingle connectivity bracket is provided It can be used with either the AAP frame plate or the cable grommet plate Step 2 Prepare the Installation Site Cut the Table or Furniture ATTENTION Installation...

Страница 3: ...r acc der au connecteurs est soulign voir CNC Wood Router ci dessous Extron ne sera pas responsable des erreurs de coupe Ensure the table surface is at least 0 50 inch 1 27 cm thick Assurez vous que l...

Страница 4: ...e accommodates up to three single space AAPs Assembly procedures are shown in figure 2 at right Cable pass through module The cable pass through module accommodates up to eight AV cables Assemble the...

Страница 5: ...cable pass through module and power module Insert the modules into the cable cubby as shown in figure 5 NOTES Extron recommends mounting the power module on the left side of the enclosure For any cabl...

Страница 6: ...rd The panel is attached to the lid with a hinge that allows access to the buttons without the panel becoming completely detatched You can now return the lid to the fully open position 5 5 From the fr...

Страница 7: ...st the enclosure Lower the Cable Cubby into the hole to test the fit If necessary carefully enlarge the opening plastic m on f the e e ON OFF PC LA PTO P MUTE MED IA PL AY ER HDMI 1 HDMI 2 2 1 3 Figur...

Страница 8: ...2 3 1 4 Figure 9 Installing Retractors Step 8 Install Cables in the Cable Cubby e ON OFF PC LAPTOP MUTE MED IA PL AY ER HDMI 1 HDMI 2 For cable pass through applications allow at least 36 inches 0 9...

Страница 9: ...plex level autodetected Data rates 10 100Base T Power over Ethernet PoE The NBP receives power at this port Default login credentials Username admin Initial password unit serial number Password after...

Страница 10: ...for the control device NOTE See the Toolbelt Help File Global Configurator Help File and Global Scripter Help File as needed for step by step instructions and detailed information The help file for GC...

Страница 11: ...Volume LEDs Volume LEDs light to act as a meter to indicate the volume level NOTE There is no item F for this NBP model G Cable Cubby lid The lid tilts back to 130 Friction washers ensure the lid hold...

Страница 12: ...ettings to factory default values without affecting user loaded files Reset to Factory Defaults Press and hold the Reset button for 9 seconds After the Reset LED blinks three times release and momenta...

Страница 13: ...13 This page is intentionally left blank...

Страница 14: ...st the system make adjustments finalize configuration Save the project Cable the NBPs and the control processor or HCR receiver then apply power Cable all devices Prepare the installation site Get rea...

Отзывы: