50
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
Site Preparation
For more information about the power specifications of the Extreme Networks family of switches, see
Appendix B, “Switch Technical Specifications”.
Power Supply Requirements
Adhere to the following requirements in order to operate your Extreme Networks equipment safely:
•
Make sure your equipment is placed in an area that accommodates the power consumption and
component heat dissipation specifications.
•
Make sure your power supply meets the site power, AC power, or DC power requirements of the
network equipment.
•
Make sure DC connections are made by an on-site electrician.
NOTE
For power specifications for Extreme Networks products, see the Extreme Networks website at
http://www.extremenetworks.com.
•
When connecting power to installed equipment, avoid connecting through an extension cord or
power strip.
•
If your switch includes more than one power supply, connect each power supply to different,
independent power sources. If a power source fails, it will only affect the switch power supply to
which it is connected. If all switch power supplies are connected to a single power source, the entire
switch is vulnerable to a power source failure.
AC Power Cable Requirements
Use an AC power cable appropriate for your country. Check your local electrical codes and regulatory
agencies for power cable requirements. The countries listed in Table 7 and Table 8 have the additional
requirements.
NOTE
When using dual power supplies, make sure that each AC power supply attaches to an independent
power source.
Table 7:
General AC power cable requirements
Country
Requirements
USA and Canada
•
The cable set must be UL-approved and CSA-certified. to the rated input power
requirements of the product,
•
The minimum specification for the flexible cable is Type SVT or SJT, 3-conductor.
•
The cable set must have a rated current capacity of at least the amount rated for each
specific product.
Denmark
The supply plug must comply with section 107-2-D1, standard DK2-1a or DK2-5a.
Switzerland
The supply plug must comply with SEV/ASE 1011.
Argentina
The supply plug must comply with Argentinian standards.
Содержание Summit 200-24
Страница 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface...
Страница 19: ...Part 1 Common Features...
Страница 20: ......
Страница 24: ...24 Extreme Networks Consolidated i and e Series Hardware Installation Guide Common Switch Features...
Страница 25: ...Part 2 Site Planning...
Страница 26: ......
Страница 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation...
Страница 57: ...Part 3 Summit Switch...
Страница 58: ......
Страница 106: ...106 Extreme Networks Consolidated i and e Series Hardware Installation Guide Summit Switch Models...
Страница 116: ...116 Extreme Networks Consolidated i and e Series Hardware Installation Guide Summit Switch Installation...
Страница 137: ...Part 4 Alpine Switch...
Страница 138: ......
Страница 158: ...158 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series Chassis Installation...
Страница 180: ...180 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series Switch Management Module...
Страница 208: ...208 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series I O Modules...
Страница 213: ...Part 5 BlackDiamond Switch...
Страница 214: ......
Страница 303: ...Part 6 Switch Operation...
Страница 304: ......
Страница 307: ...Part 7 Appendixes...
Страница 308: ......
Страница 336: ...336 Extreme Networks Consolidated i and e Series Hardware Installation Guide Switch Technical Specifications...
Страница 386: ...386 Extreme Networks Consolidated i and e Series Hardware Installation Guide...