166
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
Installing and Connecting Alpine 3800 Series Switch Power Supplies
CAUTION
Do not slam the power supply into the backplane. This or other excessive force can cause damage
and may possibly require the return of the chassis.
5
Place one hand on each side of the power supply to slowly and evenly slide the power supply into
the bay.
During the last inch of insertion into the chassis, place one hand on the central handle to steady the
power supply and use your other hand to carefully push the ejector/injector lever toward the power
supply to engage the power supply backplane connectors.
6
Using a #2 Phillips screwdriver, tighten the screw on the ejector/injector lever to secure the power
supply.
7
Slide the locking safety latch away from the “remove” position.
To install an additional power supply, repeat steps 1 through 7.
Leave the ESD strap permanently connected to the chassis so that it is always available when you need
to handle ESD-sensitive components.
Attaching the Cables and Supplying Power
After you install the power supply in the chassis, attach the cables that supply power to the chassis. To
attach the cable to the DC power supply:
1
Attach the ESD strap to your wrist and connect the metal end to the ground receptacle on the top
right corner of the switch front panel.
2
Verify that the DC power is turned off at the source.
3
Remove the plexiglas cover that shields the power connection on the power supply.
4
Place the DC ground and power cable lugs over the studs on the power supply, as shown in
Figure 91 and Figure 92.
Figure 91:
Alpine 3808 DC power supply with cables
38_lugs8
45022
45022
SLIDE TO
REMOVE
ON
OFF
-48V
RTN
WHEN INS
Содержание Summit 200-24
Страница 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface...
Страница 19: ...Part 1 Common Features...
Страница 20: ......
Страница 24: ...24 Extreme Networks Consolidated i and e Series Hardware Installation Guide Common Switch Features...
Страница 25: ...Part 2 Site Planning...
Страница 26: ......
Страница 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation...
Страница 57: ...Part 3 Summit Switch...
Страница 58: ......
Страница 106: ...106 Extreme Networks Consolidated i and e Series Hardware Installation Guide Summit Switch Models...
Страница 116: ...116 Extreme Networks Consolidated i and e Series Hardware Installation Guide Summit Switch Installation...
Страница 137: ...Part 4 Alpine Switch...
Страница 138: ......
Страница 158: ...158 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series Chassis Installation...
Страница 180: ...180 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series Switch Management Module...
Страница 208: ...208 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series I O Modules...
Страница 213: ...Part 5 BlackDiamond Switch...
Страница 214: ......
Страница 303: ...Part 6 Switch Operation...
Страница 304: ......
Страница 307: ...Part 7 Appendixes...
Страница 308: ......
Страница 336: ...336 Extreme Networks Consolidated i and e Series Hardware Installation Guide Switch Technical Specifications...
Страница 386: ...386 Extreme Networks Consolidated i and e Series Hardware Installation Guide...