298
Extreme Networks Consolidated "i" and "e" Series Hardware Installation Guide
BlackDiamond 6800 Series I/O Modules
WARNING!
To prevent ESD damage to the XENPAK module, always use an ESD-preventive wrist strap when
installing or removing the module. Handle the module by its sides only. Never touch the card-edge
connectors at the insertion end of the module.
To install a XENPAK module:
1
Remove the XENPAK module from its antistatic container and remove the dust covers from the
module connectors. If your module has a protective pad covering the card-edge connector, remove it.
Store the antistatic container, dust covers, and card-edge connector protective pad in a clean location
from which they can be easily retrieved if you need to uninstall the module.
2
Holding the module by its sides, insert it into the slot on the I/O module.
3
Slide the module as far into the slot as possible, until you hear it click, indicating that it is firmly
attached.
4
Secure the module to the I/O module faceplate by turning the two captive screws clockwise until
they are hand-tight.
NOTE
To ensure that your module is undamaged upon installation, you can correlate factory test data with
your installation site test data by consulting the average power reference values shown on the XENPAK
module test data sheet (Part No. 121074-00) enclosed with your module.
To remove a XENPAK module:
1
Turn the two captive screws counter-clockwise until they are completely free from the I/O module
faceplate.
WARNING!
Disconnect the SC fiber-optic cable from the XENPAK module before removing the XENPAK module
from the I/O module.
2
Holding both captive screws, carefully pull the XENPAK Module out of the slot.
3
Place the dust covers back into the XENPAK Module connectors.
4
Place the XENPAK Module immediately into an antistatic container to protect it from ESD damage
and dust.
Содержание Summit 200-24
Страница 18: ...18 Extreme Networks Consolidated i and e Series Hardware Installation Guide Preface...
Страница 19: ...Part 1 Common Features...
Страница 20: ......
Страница 24: ...24 Extreme Networks Consolidated i and e Series Hardware Installation Guide Common Switch Features...
Страница 25: ...Part 2 Site Planning...
Страница 26: ......
Страница 56: ...56 Extreme Networks Consolidated i and e Series Hardware Installation Guide Site Preparation...
Страница 57: ...Part 3 Summit Switch...
Страница 58: ......
Страница 106: ...106 Extreme Networks Consolidated i and e Series Hardware Installation Guide Summit Switch Models...
Страница 116: ...116 Extreme Networks Consolidated i and e Series Hardware Installation Guide Summit Switch Installation...
Страница 137: ...Part 4 Alpine Switch...
Страница 138: ......
Страница 158: ...158 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series Chassis Installation...
Страница 180: ...180 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series Switch Management Module...
Страница 208: ...208 Extreme Networks Consolidated i and e Series Hardware Installation Guide Alpine 3800 Series I O Modules...
Страница 213: ...Part 5 BlackDiamond Switch...
Страница 214: ......
Страница 303: ...Part 6 Switch Operation...
Страница 304: ......
Страница 307: ...Part 7 Appendixes...
Страница 308: ......
Страница 336: ...336 Extreme Networks Consolidated i and e Series Hardware Installation Guide Switch Technical Specifications...
Страница 386: ...386 Extreme Networks Consolidated i and e Series Hardware Installation Guide...