Figure 38: Inserting the DC terminal connector into the slot on the power supply
7. Connect the power cables to the DC source voltage, using hardware appropriate to the installation
site and following local and national electrical codes.
8. Energize the circuit. When power is connected, verify that the PWR LED is green.
When the PWR LED has turned green, follow the instructions in
Activate and Verify the Switch
64.
If the PWR LED does not turn green, refer to
on page 69 for troubleshooting
information.
Install Your Switch
Connect DC Power
ExtremeSwitching 5320 Series Hardware Installation Guide
63