Battery Replacement 

The 9V alkaline battery that powers the instrument requires replacing when all battery icon ‘fill 
bars’ 

 are depleted. To replace the battery, follow the steps below: 

 

1. 

Disconnect the electrode. 

2. 

Remove the instrument’s protective jacket by pulling it over the top of the meter (ensure that 
the electrode is disconnected). 

3. 

Pry the battery compartment up from the top of the meter using a screwdriver or coin at one 
of the two indentations (see diagram). 

4. 

Replace the 9V battery. 

5. 

Insert the battery compartment into the instrument until the compartment is flush with the 
top of the instrument. The compartment can only be fully inserted in one direction; the 
battery compartment is labeled showing the correct orientation. 

6. 

Replace the protective holster. 

Содержание PH220

Страница 1: ...USER MANUAL Waterproof Palm pH Meter Model PH220...

Страница 2: ...y does not include pH buffer temperature coefficient Note 2 Accuracy specified from 0 02pH to 13 98pH Temperature Compensation 32 to 194oF 0 to 90oC Automatic ATC Power 9 volt alkaline battery Display...

Страница 3: ...perature Note that there are other more specialized displays discussed later in the appropriate sections of this manual Order of Operations 1 Calibrate the instrument as described in the Calibration s...

Страница 4: ...ibrated at least once each day pH Calibration Procedure 1 Place the electrode into a 7 00 pH buffer solution Press and hold the CAL button until CAL appears in the display 2 The instrument automatical...

Страница 5: ...also display when the electrode is disconnected 8 When the test is complete rinse the electrode with distilled or deionized water Automatic Temperature Compensation ATC The millivolt output of a pH el...

Страница 6: ...the recall mode is accessed 3 While in the RECALL mode use the STORE RECALL button to scroll through the stored readings The most recent readings will show first LAST IN FIRST OUT 4 Press and hold th...

Страница 7: ...the top of the meter ensure that the electrode is disconnected 3 Pry the battery compartment up from the top of the meter using a screwdriver or coin at one of the two indentations see diagram 4 Repl...

Страница 8: ...60oC for 30 minutes Strong Alkaline measurement Soak in 0 1 M HCL overnight Deteriorated Gel layer Replace electrode Protein coating on electrode surface Soak in 1 gm Pepsin dissolved in 100ml of 0 1...

Страница 9: ...bration for most of our products Contact us for information on calibration and repair availability refer to the contact information below Annual calibrations should be performed to verify meter perfor...

Отзывы: