3005831-2019-04-01.fm
Handling and transport
7/64
2. Handling and transport
2.1 Transport and delivery
2.1.1 Once the VEX has arrived at the assembly site
• Check the air handling unit and any supplied accessories for any transport
damage immediately on arrival at the assembly site.
• Check that the delivery is complete.
If there is damage or something is missing, point this out immediately to
the haulier.
2.1.2 Extent of the delivery
In addition to the air handling unit, a VEX5000 delivery may include several loose parts.
All of the loose parts are enclosed in packaging and included in the packing list.
For unassembled
air handling units
• Base (optional for unassembled):
The base with cross member (1) is supplied separately and includes bolts and
fitting (3+4) for securing the air handling unit to the base. A number of adjustable
screws (5) and fitting for alignment. The base is enclosed in packaging on a
small pallet.
• Plastic covers:
Corner covers (8) and plugs (9) for covering the corners, once the hoist eyes are
removed.
• Handle and square key:
One square key (10). Handles (11) are supplied as per the number ordered,
together with screws and plugs (2).
• Sealing material:
Self-adhesive sealing strip (6) 12 x 6.4 mm for sealing joints.
• Interior sectional joints:
The sections are equipped with four interior corner fittings with clearance holes.
The fitting are assembled using 8 x 25 mm screws, and an 8 nut (7). Sides that are
longer than 1500 mm must also be equipped with fittings in the middle of the side.
1. Base
7.
Screws and nuts
for assembling sections
2. Screws and plugs for handles
8.
Plastic covers for corners
3. Fittings with hooks
9.
Plugs for plastic covers
4. Fittings
10. Square key
5. Levelling screw with foot
11. Handles for doors
6. Sealing strip
Содержание VEX5000 Series
Страница 63: ...3005831 2019 04 01 fm Spare parts 63 64...
Страница 64: ......