Issue 1.2 May 2020
EVSE Protocol Controller 2.0 (EPC 2.0) | Viridian EV
21
8.
SERVICE & MAINTENANCE
8.1 REPLACING THE DEVICE
MAINTENANCE
The Viridian EPC 2.0 charging controller is maintenance
-
free.
WARNING: THERE ARE NO USER
-
REPLACEABLE FUSES WITHIN THE EPC
VIRIDIAN EPC 2.0 REPLACEMENT
REQUIREMENT: Ensure that the plant and the device itself are de
-
energized.
DANGER: VOLTAGE HAZARDS
Contact with live components can result in serious injuries. Disconnect the system and all devices from the power supply
before starting work.
PROCEDURE:
1.
Disconnect the wiring from all EPC 2.0 connector terminals.
2.
Disassemble the device by pulling the locking slider on the back of the device down and swivel the device away from
the DIN rail and remove it.
3.
Install the new device by clipping the top locking guide onto the DIN rail and swinging it down until the locking slider
clicks into place.
4.
Reconnect the wiring.
5.
Switch on the power supply for the device and the main power for the unit feeder again.
8.2 CLEANING
Cleaning of the device is not intended or permissible.