EVS Broadcast Equipment SA
Issue 2.0.7.2 September 2021
40
Processing Module Installation and Cabling
Note
•
The Topology Setting must be identical for all Processing
Modules contributing to a Production Cluster (those which
have the same Cluster ID).
•
For proper network settings and validated devices, please
refer to the limited version of the EVS Network Design
Guide.
•
For support on network switches and their configuration,
contact your EVS Technical Support.
•
On how to configure Processing Modules to Dyvi-
‘Productions’ please refer to Supervisor section.
Содержание DYVI
Страница 1: ...HARDWARE TECHNICAL REFERENCE MANUAL Version 2 0 7 2 September 2021 ...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 56: ...EVS Broadcast Equipment SA Issue 2 0 7 2 September 2021 46 GUI Installation and Configuration ...
Страница 101: ......
Страница 102: ......