background image

 

 
 
 
 
 

Safety instructions: 

 

1.  Before installation the softener: 

Please  refer  to  the  corresponding  installation 

–  and  operation 

instructions in this manual. 

 

2.  Please  refer  to  the  local  installation  regulations  and  the  general 

directives, in particular DIN 1988 and EN1717, also the valid accident 
prevention regulations. 

 
3.  With not designated use and improper service the manufacturer is 

released from any liability. 

 
4.  Before the installation please check the statics of the walls, covers and  

grounds for loading capacity. 

According to place of action a backflow must be installed 
corresponding to local regulation before the arrangement. 
For the protection of the central tax valves from rust, sand etc. a 
suitable mudflap or fine filter should be inserted before the 
arrangement. The filter pad of the fine filters should be exchanged 
according to DINAR / DVGW at a distance of 6 months or after soiling. 
Please ensure that no water damages are caused (e.g., by ground 
expiry). The manufacturer is not liable for water damages . 
The food water of the arrangement must correspond to the information 
of the German drinking water order.  
The room temperature must be at least 7°C and may not cross 50°C. 
 

5.  Changes in the system may not be made without consultation and 

approval with evo-water oHG, for damages no other guarantee is 
taken over. 

 
6.  The system serves exclusively for the removing of undesirable mineral 

substances which retreat as a scale. It serves as a pure system 
protection. 

Содержание soft monomatik

Страница 1: ...ner the installation guide has to be read carefully For any disturbances cause by disregarding the instructions evo water doesn t accept liability evo water oHG Falkenstraße 2 72589 Westerheim Tel 49 7333 925710 Fax 49 7333 9257120 www evo water com info evo water com ...

Страница 2: ...he protection of the central tax valves from rust sand etc a suitable mudflap or fine filter should be inserted before the arrangement The filter pad of the fine filters should be exchanged according to DINAR DVGW at a distance of 6 months or after soiling Please ensure that no water damages are caused e g by ground expiry The manufacturer is not liable for water damages The food water of the arra...

Страница 3: ...f ft t m mo on no om ma at ti ik k 1 Parts 1 BYPASS 7 WATER OUTLET 2 VALVE HOUSING 8 BLENDING REGULATOR 3 RESIN TANK 9 HARDNESS REGULATOR 4 CONTAINER FOR DEVICE AND SALT 10 TO BRINE VALVE 5 BRINE VALVE floater 11 CONNECTIONS 1 2 3 4 1 6 WATER INLET 12 TO DRAIN ...

Страница 4: ...ener and drain 12 against frost Make sure you have the latest installation manual at hand Check with your evo water supplier 3 Installation 3 1 Close main valve and make sure pressure is released from piping This can be done by opening at least one tap 3 2 Cut open main water supply in order to install direct connections to the softener or to install the evo water bypass recommended Follow the arr...

Страница 5: ...pe as supplied by your local supplier In order to guarantee that the device will keep on functioning perfectly in the future this drain pipe should be spirally reinforced to avoid later blocking and or kinks Please protect the drain against frost and heat min temp 5 C max temp 50 C W w w i t h e elbow outlet with straight outlet maximum height and distance of flexible drain hose ...

Страница 6: ...ube avoid kinks Make sure to install the supplied overflow tap First pierce a hole Ø21mm in the side wall of the salt bin The location of the hole is not important make sure however that it is approx 10cm down from the top edge of the salt bin Once the hole has been drilled mount the overflow tap and secure it with the supplied nut After drilling remove all bits of plastic that have fallen into th...

Страница 7: ...he top side up Make sure that the brine valve goes all the way down to the bottom of the salt bin Make sure not to squeeze the tube avoid kinks Disconnect if necessary and reconnect correctly Close the cover 3 4 The device can be installed in the container in three different ways at the back to the left or to the right The support at the bottom of the container must be placed accordingly Please re...

Страница 8: ...ctions at the back The arrow on the support in the container must be pointing to the back Place the device in the container with the connections at the back as shown below 3 4 2 Connections to the left As in 3 4 1 ...

Страница 9: ... by evo water evo water uses ppm settings of CaCO3 10 ppm CaCO3 1 fh 1 dh 1 78 fh Adjust the hardness regulator to the measured value This requires a hex key number 5 dh ppm dh ppm 9 160 2 22 391 6 10 178 0 23 409 4 11 195 8 24 427 2 12 213 6 25 445 0 13 231 4 26 462 8 14 249 2 27 480 6 15 267 0 28 498 4 16 284 8 29 516 2 17 302 6 30 534 0 18 320 4 31 551 8 19 338 2 32 569 6 20 356 0 33 587 4 21 3...

Страница 10: ...ss in bypass mode open main valve and flush for several minutes in order to avoid impurities from entering the softener When you do not use a Bypass open the main valve slowly as described in 5 4 5 2 Fill salt bin with salt in the provided space Use only specific salt tablets that are suitable for softeners 5 3 Add water in the salt bin until the water level is approx 10cm 4 high the floater on th...

Страница 11: ...o u n t Turn programm counter clockwise until it is in above position When the arrow and the small line on the transparent cover reach the area marked by B brining the regeneration will start Immediately the PRG will drop down a little you will be able to see and hear this R stands for refill refilling the container with water at the end of the regeneration stage To make sure the softener is in re...

Страница 12: ... several minutes to allow residual water to be flushed from the tubing 5 6 4 Check outgoing hardness with a hardness test kit not supplied by evo water Adjust blending if necessary 5 7 Place both lids on the container First the valve house cover make sure the connections fit in the large opening and the drain in the small opening Then place the front lid For future salt refills only the front lid ...

Страница 13: ... knowledge about hydraulic softeners and domestic plumbing Proper working of the softener will be determined by proper installation An annual control of your Softener will guarantee optimal functioning and a long operating life The EVO WATER oHG is proud of its achievement in having provided in what we believe to be the best softener available today Moreover we are proud to have you as a customer ...

Отзывы: