background image

BATTERY INSTALLATION

Insert Battery (

TERMINALS OR

CONNECTORS FACING OUT

)

through Lamphead opening.  Allow
Transformer Cable to extend out
through Lamphead opening.

THIS PRODUCT  IS SUPPLIED WITH A CHOICE OF 3 TYPES OF BATTERY SOURCES:
SEALED LEAD CALCIUM (LC) -  NICKEL CADMIUM (Ni-Cd) - NICKEL METAL HYDRIDE (Ni-MH)

NOTE: Disconnected Battery must be recharged within 120 days.

Attach Battery Cable to LC Battery
ensuring that proper polarity is
observed.

Page 4

Lead Calcium (LC)

Backbox Opening

Nickel Cadmium (Ni-Cd)

To PC Board
Battery Connector

Nickel Metal Hydride (Ni-MH)

Содержание Aperion LED

Страница 1: ...ng by unauthorized personnel The use of accessory equipment not recommended by the manufacturer may cause an unsafe condition Do not use this equipment for other than intended use Servicing of this eq...

Страница 2: ...re supplied by others UNIT IS APPROVED FOR TYPE ICINSTALLATION Alignbackboxsolampheadopeningisflush orslightlybehindinnersurfaceofceilingorwall ROUGH IN CEILING AND WALL MOUNT SUPPORTING MEMBERS MUST...

Страница 3: ...ved wire clamp and make connections using wire nuts supplied Connect wires per local codes Connect to transformer as follows Feed transformer secondary cable with connector through hole in splice box...

Страница 4: ...UPPLIED WITH A CHOICE OF 3 TYPES OF BATTERY SOURCES SEALED LEAD CALCIUM LC NICKEL CADMIUM Ni Cd NICKEL METAL HYDRIDE Ni MH NOTE Disconnected Battery must be recharged within 120 days Attach Battery Ca...

Страница 5: ...with pivoting door Latch Tabs Push door open to access Spring Latch Bar Spring Latch Bar Insert Phillips screwdriver into hole as shown push down and forward to engage latches NOTE Once Battery is co...

Страница 6: ...lly Recessed Emergency Light has an adjustable LED assembly mounted on the moveable door For wall mounting the LED assembly should be aimed down towards the floor For ceiling mounting the LED assembly...

Страница 7: ...usly USER TEST A manual USER TEST can be performed for 30 seconds or 90 minutes By pushing the TEST Switch for 1 second the door will open and the lamps will illuminate for 30 seconds If the STATUS in...

Страница 8: ...Replace Battery Factory Service Check for Paint Seal Replace Lamp For 90 minute User Tests wait for full charge For 30 second User Tests try again after an hour of charging Page 8 BATTERY The battery...

Отзывы: