CLOSE-IN CEILING AND WALL MOUNT
5-1/4" high
5-1/2" wide
opening
DRY WALL:
WET WALL:
Cutout hole in ceiling material should be 5-1/4” high by 5-
1/2” wide. Align backbox so lamphead opening is flush, or
slightly behind inner ceiling or wall surface.
Plaster flush up against lamphead opening.
WIRING INSTRUCTIONS
AC Input
Knockouts
Back Box
Rear View
Ground
Wire
Transformer
Primary Wires
Back Box
Internal View
Select and remove desired knockout(s) for AC
power input with at least 6" of AC power leads
extending into backbox. Secure cable with approved
wire clamp and make connections using wire nuts
supplied. Connect wires per local codes. Connect to
transformer as follows:
Feed transformer secondary cable (with connector) through hole in splice box cover and insert
tabs into slots on the rear of the back box. Snap front tabs into slots on the top, front flange of the
backbox.
DE-ENERGIZE BRANCH CIRCUIT AT BREAKER PANEL
INSTALL SPLICE BOX COVER
Rear Splice box
cover slots
Tabs
Splice Box Cover
BLACK
120V
Lead for
or
ORANGE
277V
Lead for
(CAP UNUSED LEAD)
WHITE
Neutral
Lead for
Connect
GREEN/YELLOW
Lead for
GROUND
. Dress AC and Ground
wires down to bottom of backbox.
DO NOT REAPPLY POWER
UNTIL FINAL SETUP
Transformer
Secondary Cable
Page 3
Hanger Bar
Clamp
Hanger Bar
Clamp Bolt