
Contents
Contents Page
Cont.5
Chapter 1 G
ETTING
S
TARTED
Equipment Inspection and Storage...............................................................1-2
Packaging and Lifting Details.......................................................................1-2
About this Manual.........................................................................................1-2
Initial Steps ............................................................................................................... 1-2
How the Manual is Organised ................................................................................... 1-3
Chapter 2 A
N
O
VERVIEW OF THE
C
ONVERTER
How it Works .................................................................................................2-1
Control Features............................................................................................2-2
Understanding the Product Code..................................................................2-3
Model Number (Europe)............................................................................................ 2-3
Catalog Number (North America).............................................................................. 2-4
•
Door Assembly Product Code ................................................................. 2-5
Product Identification....................................................................................2-5
Component Identification..............................................................................2-6
•
590+ Controller (Frames 1 & 2)............................................................. 2-6
•
590+ Door Assembly (Frames 3, 4, 5 & H)............................................ 2-7
•
590+ Controller (Frame 3)..................................................................... 2-8
•
590+ Controller (Frames 4 & 5)............................................................. 2-9
•
590+ Product (Frame H) ...................................................................... 2-10
Chapter 3 I
NSTALLING THE
C
ONVERTER
Mechanical Installation.................................................................................3-1
Unpacking the Converter .......................................................................................... 3-1
•
Lifting the Converter ............................................................................... 3-1
Changing DC Output Terminals (Frame H) ................................................................ 3-2
Removing the Cover (Frame H)................................................................................. 3-2
Product Dimensions .................................................................................................. 3-3
Mounting the Converter............................................................................................. 3-4
•
Recommended Tools .............................................................................. 3-4
•
Ventilation and Cooling Requirements..................................................... 3-4
AC Line Choke ......................................................................................................... 3-4
Installing the Fan (Frame H) ...................................................................................... 3-5
Installing the External Vent Kit (Frames 4 & 5) ............................................................ 3-5
Electrical Installation.....................................................................................3-6
Minimum Connection Requirements (Frames 1, 2, 3, 4 & 5) ....................................... 3-8
•
Important Connections ........................................................................... 3-8
•
Protective Earth Connections (PE) - (Frames 1, 2, 3, 4 & 5) ...................... 3-9
•
Power Wiring Connections (Frames 1, 2, 3, 4 & 5) ................................ 3-10
•
Control Wiring Connections (Frames 1, 2, 3, 4 & 5) .............................. 3-13
Minimum Connection Requirements (Frame H) ........................................................ 3-17
•
Protective Earth Connections (PE) - (Frame H) ........................................ 3-18
•
Power Wiring Connections (Frame H).................................................... 3-19
•
Control Wiring Connections (Frame H) ................................................. 3-21
Содержание 590+ Series
Страница 16: ...1 4 Getting Started 590 Series DC Digital Converter ...
Страница 58: ...3 32 Installing the Converter 590 Series DC Digital Converter Figure 3 11 Frame 2 40A 165A Stack Assembly ...
Страница 76: ...3 50 Installing the Converter 590 Series DC Digital Converter ...
Страница 110: ...5 14 The Operator Station 590 Series DC Digital Converter ...
Страница 194: ...7 10 Trips and Fault Finding 590 Series DC Digital Converter ...
Страница 208: ...9 6 Control Loops 590 Series DC Digital Converter ...
Страница 236: ...10 28 Parameter Specification Table 590 Series DC Digital Converter ...
Страница 260: ...11 24 Technical Specifications 590 Series DC Digital Converter ...
Страница 274: ...12 14 Certification for the Converter 590 Series DC Digital Converter ...
Страница 300: ...15 2 The Default Application 590 Series DC Digital Converter ...
Страница 308: ......