Product-manual Model: 635/DER u. 635/K DER
07-01-05-06-E-V1002.doc
55
8
Commissioning
CAUTION !
Wiring errors or incompatible operation may cause unpredictable motions.
Avoid danger for men and machine !
8.1
Preparation
l
For PC-link use the Eurotherm communication software EASYRIDER
<
. For the start,
we suggest exercises in simulation mode to get familiar with EASYRIDER.This chapter
presumes the knowledge how to handle EASYRIDER.Suggestions: Use testequipment to
train yourself.EASYRIDER
<
contains interactive HELP - functions.
l
For security-reasons the access to several functions is blocked by password.
Commissioning has to be executed by trained stuff only.
l
Users may have their application-adapted commissioning methode when familiar with
the product, on their own resposibility.
l
The system must be in accordance with all valid safety specifications. The function of all
safety equipment (limit-switches for example) have to be checked.
l
To activate the power-stage of the drive, the "ACTIVE"-signal (X10.22 against X10.9)
has to be exited.
Содержание 635
Страница 63: ...Product manual Model 635 DER u 635 K DER 07 01 05 06 E V1002 doc 63 10 Block circuit diagram ...
Страница 72: ...72 Product manual Model 635 DER u 635 K DER 07 01 05 06 E V1002 doc 14 Certificates ...
Страница 73: ...Product manual Model 635 DER u 635 K DER 07 01 05 06 E V1002 doc 73 Certificates ...
Страница 74: ...74 Product manual Model 635 DER u 635 K DER 07 01 05 06 E V1002 doc Certificates ...
Страница 75: ...Product manual Model 635 DER u 635 K DER 07 01 05 06 E V1002 doc 75 Certificates ...
Страница 77: ...Product manual Model 635 DER u 635 K DER 07 01 05 06 E V1002 doc 77 16 Notes ...