00037766.DOC, Version 1.0
22/26
INSTALLATION
DANGER TO LIFE!
Please consider the
and the respective national norms during the
installation! The installation must only be carried out by an authorized dealer!
DIN 15560-27
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Before lifting or lowering the telescopic tubes, you must always block a safety area around the stand. This
safety area must have a diameter of 1.5 times the maximum height.
Procedure:
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the loads. If you lack these qualifications, do not attempt the installation yourself, but
instead use a professional structural rigger. Improper installation can result in bodily injury and/or damage to
property.
Inspection before use
Fundamentals
The pre-operation inspection is a visual inspection performed by the operator prior to each work shift.
This inspection is designed to discover if anything is apparently wrong with a machine before the operator
performs the function tests.
Refer to the following list and check each of the items.
If damage or any unauthorized variation from factory delivered condition is discovered, the machine must be
tagged and removed from service.
Repairs to the machine may only be made by a qualified service technician, according to the manufacturer's
specifications. After repairs are completed, the operator must perform a preoperation inspection again before
going on to the function tests.
Do not operate unless:
You learn and practice the principles of safe machine operation contained in this operator’s manual.
Avoid hazardous situations.
Always perform an inspection before use.
Know and understand the inspection before use before going on to the next section.
Always perform the function tests prior to use.
Inspect the workplace.
Only use the machine as it was intended.
Check the following components or areas for damage, improperly installed or missing parts and
unauthorized modifications:
Winch and related components
Base components
Outriggers, outrigger screw jacks, outrigger foot pads and outrigger casters
Mast columns
Exterior plastic shim for safety brake
Cable anchor
Cables and pulleys