12
Fig. 1
Heating system with top pouring
Fig. 2
Parallel connection.
Electromechanical model of the automatics
Label number
Name of the equipment
1.
Electrode boiler
2.
Radiator
3.
Surge tank
4.
Reserve electrode boiler
5.
Main boiler running on
solid, liquid or gas fuel
Legend
- Laid-on thermostat
(sensor)
- Valve
- Filter (mechanical
mud settler)
- Heat-transfer agent
drain valve
- Air drain valve
- Circulation pump
(power – 70 or 100
W)
A – Vertical settler of height which is no less than
2 m. located above the boiler.
The diameter should meet the project
documentation requirements of the heating
system without circulation pump depending on
the floor and the size of the heated premises.
B – Difference in height (no less than 1,5 m.)
Fig. 3
Reserve electrode boiler connection diagram