Boiler repair 

Remove the boiler from the heating system. Remove the electrode group (electrode) 

from  the  boiler  case.  Decontaminate  the  internal  surfaces  of  the  boiler.  Be  convinced  of 
absence of any defects. 

It is necessary to perform the following tasks in the course of the boiler repair: 

• 

Remove an electrode (of the single-phase electrode boiler) or electrode group 
(of  the  three-phase  electrode  boiler)  from  the  boiler  case.  Electrode  or 
electrode  group  should  be  inspected  for  absence  of  defects  (cracks  of  the 
bushing  insulators,  etc.)  and  for  evaluation  of  electrodes  wear.  In  case  of  a 
wear comprises more than 40%, the electrode (electrodes) should be replaced. 
Traditionally, this happens every 3-5 years. 

• 

Clean  the  mating  surfaces  carefully  for  providing  leak  resistance  which  is 
achieved by applying sealing materials in the course of the boiler assembly and 
its further operation. 

• 

Give the internal surfaces of the boiler case a mirror-like polish. The internal 
surfaces should be inspected for absence of defects (such as point corrosion, 
etc.). 

• 

Assemble  the  boiler.  The  boiler  assembling  should  be  performed  with 
scrupulous  attention  to  alignment  between  electrodes  and  to  alignment 
between electrodes and the boiler case. By this is meant that equal spacing 
should exist between electrodes and between electrodes and the boiler case. 
Exclude the ingress of contamination into the boiler in the course of the boiler 
assembling. Check leak resistance of the boiler.  

Install the boiler only vertically into the heating system. Fill the heating system with 

heat-transfer agent. The surge tank should be one-thirds full of the heat-transfer agent. 

On completion of the tasks listed above it is necessary to check leak resistance of the 

heating system, tightening of the bolted and electrical connections, reliability of grounding 
connection, value of the electric resistance of grounding, and reliability of automatics. Perform 
a trial start of the heating system. Correct the detected malfunctions as may be required. 

A person responsible for performing these tasks should make an entry in the List of 

the performed maintenance functions, assure it by his own signature and by the seal of the 
firm (organization) and to write the address and license number of the firm (organization) 
(Appendix No. 2). 

“Galan-Potok” low-freezing liquid as a heat-transfer agent 

In this case the preventive maintenance of the boiler is performed one in every three 

years between the cold seasons. The examination and checking of the tightening of the bolted 
and electrical connections, and the reliability of grounding connection are performed yearly. 

A  procedure  of  performing  the  preventive  maintenance  is  similar  to  the  procedure 

described above which is performed in case of using water as a heat-transfer agent with the 
exception of washing the system that is not performed and with observance  of the  safety 
measures. 

The washing of the system is not performed because the “Galan-Potok” low-freezing 

liquid contains rust prevention additives and components against formation of scum and scale. 

It is necessary to clean the boiler and its components of low-freezing liquid carefully 

by flushing with water before performing the boiler repair.  

Visual examination of the boiler operation 

This task can be performed by the instructed persons no younger than 18 years old. 

These  specialists  should  be  acquainted  with  the  given  Operation  manual  and  the  boiler 
construction. 

It is necessary to monitor the volume of the heat-transfer agent in the heating system 

by its level in the surge tank during visual examination of the boiler operation. The surge tank 
should be one-thirds full of heat-transfer agent under normal conditions. If level of the heat-
transfer agent in the surge tank is lower than the specified volume a specialist of the firm 
(organization) serving a system should perform one of the following procedures depending 
on a kind of the heat-transfer agent: 

Содержание Geyser-9

Страница 1: ...OCHAG GEYSER VULKAN ELECTRODE BOILERS OPERATION MANUAL...

Страница 2: ...2 Contents...

Страница 3: ...ible annoying errors in the process of installation of the heating system and boilers and in the course of starting further operation and usage of the electric boilers we convincingly ask you to famil...

Страница 4: ...with the Table 1 Example Galan Ochag 6 electrode boiler All of the Ochag Geyser and Vulkan electrode boilers described in the Table 1 are certified Number of the certificate of conformity RU ME71 H000...

Страница 5: ...ng th of the boiler on each phase A curre nt freque ncy 50 Hz 9 1 13 7 22 7 27 3 13 7 22 7 37 5 6 N ominal curren t streng th of the autom atics A electro mecha nical model 10 16 25 32 3x16 3x25 3x40...

Страница 6: ...in the heating system liters 20 40 25 50 30 60 35 70 50 100 100 200 150 300 11 Nomin al diamet er of couplin gs for connec ting to the heating system mm 25 25 25 25 32 32 32 12 Class of protect ion ag...

Страница 7: ...alan Joint Stock Company fall into the following categories Single phase electrode boilers Ochag 2 Ochag 3 Ochag 5 and Ochag 6 electrode boilers Three phase electrode boilers Geyser 9 Geyser 15 and Vu...

Страница 8: ...boilers Simplicity of installation compact size and light weight For example the weight of the boiler the power of which is equal to 6 kW comprises 1 1 kg and the weight of the boiler the power of wh...

Страница 9: ...lement Automatics operation manual 1 item Package 1 item Note One of the models of the automatic control units produced by the Firma Galan Joint Stock Company is chosen The warranty is not applied to...

Страница 10: ...ce of the heating system grounding should be no more than 4 Ohm The copper wire with the cross section of 4 6 sq mm is used as the conductor for the grounding Table 1 The arrangement of the protective...

Страница 11: ...er the surge tank and before the inlet connection of the boiler see Figures 1 2 3 It is strictly forbidden to install valves and other regulating or locking mechanisms on the pipeline between the boil...

Страница 12: ...thermostat sensor Valve Filter mechanical mud settler Heat transfer agent drain valve Air drain valve Circulation pump power 70 or 100 W A Vertical settler of height which is no less than 2 m located...

Страница 13: ...f the heating systems produced by the Firma Galan Joint Stock Company In the course of starting up and adjustment tasks and on the basis of the specific situation the following temperatures are set on...

Страница 14: ...in the necessary temperature indoors This system makes it possible to connect four additional sensors security sensor gas leak sensor water flooding sensor etc The Galan GSM cellular monitoring system...

Страница 15: ...ipping contactor size 2 up to 32 A 2 1 Automatic tripping contactor coil 220 V 2 2 Thermal relay contacts normally closed 3 Inlet temperature sensor laid on bimetallic thermostat 4 Outlet temperature...

Страница 16: ...ry washing It is necessary to observe the following rules The heating system should be disconnected from the power network before the filling a heating system with water or low freezing liquid It is n...

Страница 17: ...a heat transfer agent It is necessary to reduce or to increase the water specific electrical resistance hereinafter referred to as correcting procedure for providing the electric boiler operation wit...

Страница 18: ...ary to switch on the heating system after equalization of the measured value of the starting current strength and the table value Once the temperature on the Inlet sensor has reached the value of 60 C...

Страница 19: ...ganization firm which has performed these tasks should make an entry in the List Appendix No 2 which is assured by the person responsible for performing these tasks and by the seal of this organizatio...

Страница 20: ...f grounding and reliability of automatics Perform a trial start of the heating system Correct the detected malfunctions as may be required A person responsible for performing these tasks should make a...

Страница 21: ...e heat transfer agent which is used in the heating system water or low freezing liquid It is necessary to disconnect the heating system from the power network to perform the following tasks providing...

Страница 22: ...ort circuit in electric system because of incorrect boiler connection The water electric resistance is significantly lower than 3100 Ohm cm at temperature of 15 C Call the electrician Check the corres...

Страница 23: ...e course of guarantee period of operation The operation and preventive maintenance are performed in accordance with the given Operation manual 5 The manufacturer does not bear responsibility for the b...

Страница 24: ...and after guarantee services are provided COUPON No 2 Electrode heating boiler COUNTERFOIL OF THE COUPON No 2 For warranty repair maintenance service Date of withdrawal ___ __________ _____ Executor...

Страница 25: ...ting system installation on a turn key basis warranty and after guarantee services are provided List of the performed maintenance functions Date description of the maintenance functions License number...

Страница 26: ...ery and sale certificate The electrode boiler meets the requirements of the Technical Specifications TS No 3468 001 17289826 02 Date of issue Seal of the Quality Department Sold Date of sale Place of...

Страница 27: ...9 196 04 40 196 04 41 123098 Moscow m Shchukinskaya ul Marshala Novikova 2 building 1 http www galan ru e mail office galan ru MAXIMUM WARMTH MINIMUM COSTS OUR COMPANY PERFORMS THE DESIGNING INSTALLAT...

Отзывы: