background image

 

24           |           24 

 
 

 

Etrel Load Guard | User manual 

 

 

 

 

 

 

 

 

 

 |   

NEGATIVE VALUE OF ACTIVE POWER 

If  the  Load  Guard  Configuration  windows  is  showing  negative  active 
power this could mean the following: 

 

Measuring  current  transformer  is  not  turned  correctly  on  the 
phase that is showing negative active power, or the conductors 
are  switched  directly  on  Load  Guard  (switched  conductors  on 
measuring current transformer or on the Load Guard) 

 

The  measuring  current  transformer  is  set  on  two  conductors 
(consumption  conductor  and  production  conductor),  however 
the production is larger than production. This would mean that 
the displayed total power is not correct (because the power of the 
phase with negative power is subtracted). 

 

Figure 41: The value of measured power is negative 

DISPLAYED POWER IS NOT CORRECT 

If the displayed power of any phase is not correct, that would mean that 
the conductors are not set on the right phase conductors. 

 

Figure 42: Display of charging power 

For  correct  calculation  of  phase  L1  power  the  measuring  current 
transformer L1 set on phase conductor of phase L1. In addition, the supply 
conductor of phase L1 must be correctly set on phase L1. Otherwise, Load 
Guard would be measuring current of one phase and voltage of another 
phase and like it is shown on the above figure, at current of 90.248 A the 
calculated power is lower than the power at current of 61.095 A which is 
not correct.  

Содержание load guard

Страница 1: ...ETREL LOAD GUARD USER MANUAL Document version 2 1 Document date 30 7 2020...

Страница 2: ...OMPUTER AND CHARGING STATION11 Computer IP Address 11 Charging Station IP Address 12 5 CONFIGURATION 14 Software for Configuration 14 Configuration of the Load Guard 16 Load Guard Network Settings 16...

Страница 3: ...ue or increasing it to utilise the remaining available power for faster charging As Load Guard measures electric current in both directions it is capable of sensing the power surplus generated by loca...

Страница 4: ...er supply but rather share available power with other consumers in the building Homes Apartment buildings Business fleets Parking spaces Commercial buildings PREREQUISITES FOR USE Load Guard connected...

Страница 5: ...se or decrease the charging power or even stop it completely to prevent the fuses from switching off due to overcharging Load Guard allows charging with maximum current without overloading the fuses F...

Страница 6: ...ONS DIMENSIONS 90 5 x 53 5 x 61 8 mm Width 3 TE on DIN rail WEIGHT 0 23 0 70 kg packaging adds 0 10 kg CLAMP CABLE LENGTH 70 cm CLAMP DIAMETER Small 16 mm large 24 mm CONNECTION Single phase or three...

Страница 7: ...that is flowing back to the electrical grid In case of production of energy at the location it can turn up the charging power suppling the electric vehicle When bought at the same time the Load Guard...

Страница 8: ...urrent transformers CONNECTING THE CURRENT TRANSFORMERS Figure 8 Connecting the current transformers THREE PHASE CONNECTION For proper three phase connection current clamps must be placed on specific...

Страница 9: ...hases are not connected in correct sequence the Load Guard power calculation will be wrong Figure 10 Arrangement of input and output phases Measuring current transformers are connected to the Load Gua...

Страница 10: ...pointing in the direction of energy flow SINGLE PHASE CONNECTION In case of single phase connection the measuring current transformer is set only on the phase conductor that is used as shown on the fo...

Страница 11: ...nt photovoltaic cells batteries the measuring current transformers can be set on two conductors production conductor and consumption conductor In this case the Load Guard would be measuring the differ...

Страница 12: ...rth must be different among the devices COMPUTER IP ADDRESS To obtain IP address of the computer the Windows Command Prompt is used Press Win R on the keyboard and in the presented window type cmd and...

Страница 13: ...uard Configuration Software settings If this is not true the software could not find the Load Guard and even if Load Guard is found the configuration is not possible CHARGING STATION IP ADDRESS If the...

Страница 14: ...Display of IP address after pressing the reset button for 5 s Figure 21 Selection of login mode The IP address of the charging station and the state of the connection with central system will be disp...

Страница 15: ...solutions atlassian net wiki download attachments 258867203 Load Guard Configurator 1 4 zip api v2 Expand the compressed file in new folder Load Guard Configurator 1 4 Click on LoadGuardConfigurator e...

Страница 16: ...uard information Load Guard serial number is important information In the above case it is 18430011 For establishing connection this serial number must be listed in charging station web interface Clic...

Страница 17: ...re presented in a same way as on the above figure currents powers voltages times it means that the Load Guard Configurator software successfully connected to the Load Guard If the time on the Load Gua...

Страница 18: ...t part of the same network group as the computer anymore e g switching of one of the first three numbers of the IP address only the IP address and serial number of the Load Guard will be displayed In...

Страница 19: ...vailable the configuration of Load Guard can continue In IP address field the IP address of the charging station must be written also in the Serial field the serial number of the charging station must...

Страница 20: ...he data that Load Guard is sending Confirm the setting with click on Save changes Figure 32 Setting the measurement report interval PAIRING OF CHARGING STATION WITH LOAD GUARD To connect to INCH charg...

Страница 21: ...Serial number of the Load Guard must be written in the field Serial number in the presented case this number is 18430011 After that click on Save and restart the charging station If the communication...

Страница 22: ...r the Load Guard would measure total consumption current of the charging station and other loads and send the data to the master charging station If total current that Load Guard measures surpasses th...

Страница 23: ...is another connection enabled in the computer it must be disabled All of the possible connections should be disabled except the one used for the connection to the Load Guard NO CONNECTION BETWEEN LOA...

Страница 24: ...ngle phase connection and in the Load Guard Configurator windows the voltage is not shown or it is very low 5 V it means that the supply of phase and neutral conductors of Load Guard are switched Note...

Страница 25: ...isplayed total power is not correct because the power of the phase with negative power is subtracted Figure 41 The value of measured power is negative DISPLAYED POWER IS NOT CORRECT If the displayed p...

Отзывы: