Preparation
Installation
8
Installation
Assembly and installation only by qualified
specialist personnel
The assembly and installation may be performed
by specialist personnel with the corresponding
qualifications only.
Technical illustrations
The technical illustrations in this documentation show
the pellet suction system of the HACK 200 kW wood
chip boiler (which is representative of all compatible
ETA boilers).
8.1
Preparation
Preparing the pellet store
See page 34 for details.
Determining the installation position
•
We recommend installing the pellet suction system
with at least two people.
•
Take the minimum clearances for maintenance
and cleaning into account, see page 10.
•
Determine the positions for the connections.
The connections for the conveyor and return pipes
can be turned in 45° steps.
8.2
Attaching carrying aids
1. Remove the safety brackets from the pellet suction
system and the transport pallet.
2. Remove the 2 M10 x 25 hex screws on the bearing
plate.
3. Reattach both safety brackets with the 2 M10 x 25
hex screws.
8.3
Support stand pre-assembly
WARNING!
Injuries caused by tipping parts
Possible injuries or damage caused by in-
adequately secured parts.
Secure all parts adequately against tipping.
The required height for the support stand
depends on the ETA boiler being used.
1
Hole for HACK VR 333 - 350 kW
2
Hole for HACK 200 kW
3
Hole for HACK 110-130 kW
Содержание HACK 130-200
Страница 23: ...Configuration Installing a configuration 23 ...
Страница 42: ...42 www eta co at Appendix 15 Appendix ...
Страница 46: ...www eta co at ...
Страница 47: ......
Страница 48: ...www eta co at ...