32
www.eta.co.at
Maintenance (expert)
Cleaning and maintenance
Replace the insulation placed over the heat exchanger
cover.
Fig. 2-74: Insulation
2.6.4
Check ash box position switch
Check ash box position switch
Inspect the function of the ash box position switch. It
must be actuated when the ash box is fitted.
Fig. 2-75: Position switch for ash box
Содержание eHACK 20-50 kW
Страница 1: ...2018 05 14 EN 0000000262 V 006 3 43 0 5007 93032 002 Wood chip boiler eHACK 20 50 kW Service manual...
Страница 7: ...Cleaning and maintenance Maintenance notes 7...
Страница 74: ...www eta co at...
Страница 75: ......
Страница 76: ...www eta co at www eta co at downloads DOWNLOAD...