![eta 939058-001 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/eta/939058-001/939058-001_operating-instructions-manual_2430361011.webp)
Installation
11
Align the heat transfer station vertically to the wall with
the help of the setting screws.
Fig. 4-5: Set screws
Set a clearance of approx. 5 - 15 mm to the wall so that
the insulation can be mounted properly.
Fig. 4-6: Distance to the wall
Mounting the connections
Mount the connections for the primary circuit on the
heat transfer station. The return is equipped with an
emptying device.
Fig. 4-7: Connections for primary circuit
Then mount the connections for the secondary circuit.
Make sure that the flow and return are properly
positioned.
Fig. 4-8: Connections for secondary circuit