Estella 236ECEM1 Скачать руководство пользователя страница 13

TO MAKE A WARRANTY CLAIM:

In order to make a claim against this warranty, please contact Ready Kitchen Warranty.  Please have your model number, serial 

 

 

 Phone:  717-381-4844   

 

Email [email protected] 

issue in your email. Including clear pictures of the issue will help expedite the process. Failure to include one or more of these 

HEREBY DISCLAIMS ALL IMPLIED 

WARRANTIES, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY AND OF FITNESS FOR A PARTICULAR 
PURPOSE.
This Limited Warranty does not cover: 

• 
• 
• 
•  Equipment not purchased directly from an authorized dealer
• 
• 
•  Equipment where the serial number plate has been removed or altered.
• 

•  Defects and damage due to improper maintenance, wear and tear, misuse, abuse, vandalism, or Act of God.

 

•  Total Dissolved Solids: Minimum 50 PPM, Maximum 125 PPM 
•  Total Hardness: Minimum 3 GPG, Maximum 5 GPG 
•  pH: Minimum 6.5, Maximum 7.5 
•  Free Chlorine: Maximum 0.5 PPM 
•  Total Chlorine: Maximum 1 PPM

Estella warrants its equipment to be free from defects in material and workmanship for a period of 1 year when installed by a 

warranty must be made within 

1 year

 from the 

date of delivery

 of the equipment. Only the equipment’s original purchaser may make 

a claim under this warranty. Estella reserves the right to approve or deny the repair or replacement of any part or repair request.  The 
warranty is not transferable. Estella Equipment installed in/on a food truck or trailer will be limited to a period of 

30 days

 from the 

original date of delivery.

This warranty only applies to the following product series: 

236ECEM

.

EQUIPMENT LIMITED WARRANTY

Содержание 236ECEM1

Страница 1: ...04 2022 236ECEM1 1 Group 236ECEM3 3 Group 236ECEM2 2 Group ESPRESSO MACHINES USER MANUAL...

Страница 2: ...s 3 Installation 3 Setup 3 Operation 5 Cleaning Maintenance 6 Parts Diagram 8 Wiring Diagram 236ECEM1 9 Wiring Diagram 236ECEM2 10 Wiring Diagram 236ECEM3 11 Warranty 12 INDEX NOTE Save these instruct...

Страница 3: ...ctions specified in this manual to ensure the best operation efficiency of machine 10 If the machine breaks down or functions abnormally please turn off machine and its power source and notify profess...

Страница 4: ...re A cold water connection is required for this unit to function properly Contact a qualified technician to ensure that your electrical and water setup are correct to the specifications of the machine...

Страница 5: ...eft OUTPUT VOLUME AND FREQUENCY SETUP 1 To program turn the output volume setup switch ON Fig 1 2 The output LEDs Fig 2 should be lit with the 5th button flashing indicating the machine is in setup mo...

Страница 6: ...ing from the right output system to the left 2 The default is 10 cleaning cycles 3 If you want to stop before the completion of all 10 cleaning cycles press button 3 4 Flush the group after flushing t...

Страница 7: ...eat gasket and remove residual coffee grounds from the inside 4 Flush the steam outlet in REVERSE daily before shutting off the machine 5 Remove the copper plate and filter element from the water outl...

Страница 8: ...e tube Drain is for use with liquids only DO NOT put any solids coffee grounds etc down the drain To extend your boiler s serviceable life when the machine is expected to sit idle for a period of one...

Страница 9: ...b 2 Espresso Brewing Unit Control Panel 3 Steam Knob 4 Brewing Group 5 Steam Tube 6 Main Power Switch 7 Drain Tray Description 8 Foot 9 Sight Glass Boiler Water Level Check Window 10 Espresso Filter H...

Страница 10: ...switch Motor pump connector connector Water level probe Operation panel group1 Ground Flowmeter group1 Dosing setting Ground Water inflow solenoid valve Group1 solenoid valve Temperature Protector G...

Страница 11: ...wer switch Motor pump connector connector group1 Ground Flowmeter group1 Dosing setting Flowmeter group2 group2 Operation panel Water level probe Ground Water inflow solenoid valve Group1 solenoid val...

Страница 12: ...onnector connector group1 Ground Flowmeter group1 Dosing setting Flowmeter group2 Flowmeter group3 group2 group3 Operation panel Water level probe Water inflow solenoid valve Group1 solenoid valve Gro...

Страница 13: ...ear and tear misuse abuse vandalism or Act of God Total Dissolved Solids Minimum 50 PPM Maximum 125 PPM Total Hardness Minimum 3 GPG Maximum 5 GPG pH Minimum 6 5 Maximum 7 5 Free Chlorine Maximum 0 5...

Страница 14: ...urchase is required to obtain warranty coverage This warranty is only valid to the original purchaser and only to equipment installed in the contiguous United States The warranty is not transferable a...

Страница 15: ......

Отзывы: