background image

1    

E-S Allegiant Series

Single Swing and Dual Swing Gate Opener 

Do-It-Yourself Installation and Operation Manual

Estate Swing brand gate openers are a Sequoia Brands, Inc. product. 

Please visit www.estateswing.com for manual updates and other product information 

This gate opener is low voltage and bolt on specifically designed for homeowner installation. 

Содержание E-S Allegiant Series

Страница 1: ...f Installation and Operation Manual Estate Swing brand gate openers are a Sequoia Brands Inc product Please visit www estateswing com for manual updates and other product information This gate opener...

Страница 2: ...arging Control 16 16 16 650lbs 650lbs 650lbs Notes 1 When laying electrical cables use appropriate rigid and or flexible tube 2 Do not run any wires in the same conduit as110 AC power that may be in t...

Страница 3: ...ock Washer Washer Nut Control box with control board Battery Harness wire with two loose ends for you to attach to battery connectors not included Charge controller Transformer with spade connectors f...

Страница 4: ...direct burial low voltage wire Needed for wired accessories the transformer to the control box the solar panel to the control box 4 3 8 Carriage Bolts Lock Washers and Nuts This is for attaching your...

Страница 5: ...your gate in towards the property The majority of installations are pull to open PUSH TO OPEN This operation is commonly used if your driveway slopes up after the gate preventing it from swinging in T...

Страница 6: ...e on the post or column The only location of importance is the boomerang bracket that the gate opener attaches to matches the setback on this page 5 Use the setback for the degree you are trying to op...

Страница 7: ...ang bracket template for trimming Trim the boomerang bracket to match the template 2 Place the boomerang template on the other corner of the setback template Pivot the boomerang bracket template to th...

Страница 8: ...ang bracket through hole of the L shape using a 3 8 drill bit 6 Insert the 3 8 bolt and secure the boom erang in place after checking once again it is positioned to match the setback using a lock wash...

Страница 9: ...k washers washers and nuts Recheck the open position at this point it is adjusta ble by the length of the oblong holes After the location is confirmed drill a 1 4 hole through the center hole of the g...

Страница 10: ...a high moisture area apply petroleum jelly on to the terminal block to protect from moisture Running wire under the driveway Needed Narrow shovel water pipe no more that 5 in length you would need a t...

Страница 11: ...ave the factory installed jumper between the terminals PHOTO and GND installed If using a photo eye it is best to leave the jumper installed until after programming is finished and accessories are bei...

Страница 12: ...the battery atop the battery lifts 16 Connect the charging controls to the battery See below for connection details Transformer Charge board Transformer can be located up to 200 feet from the battery...

Страница 13: ...ly close at full speed Once closed the programming is complete For SINGLE GATE Push to Open 17 Remove sticker on end of the arm Press release the SET button P1 will show on the display Press release D...

Страница 14: ...automatically close at full speed Once closed the For DUAL GATE Push to Open 17 Remove sticker on end of the arm Press release the SET button P1 will show on the display Press Add to select PC for pu...

Страница 15: ...t if there is a delay and closes second It is recommended to have a delay of 3 seconds to avoid any jamming issues between leafs P5 is release time for the gate lock Note this parameter will only disp...

Отзывы: