background image

15    

22. Set the parameters to match the needed settings. Press/release the SET button
to access the parameters. Press/release the ADD or DEC buttons to review or
change the individual parameter settings. Press/release the SET button to move
to the next parameter.

P1 is setting pull or push to open

.  

00 = Push to open, 01 = Pull to open 

P2 is setting primary leaf force

The lower the number the easier the gate will re-

verse directions when it meets resistance. This number may have to be changed to a high-
er setting if your gate is obstructing unexpectedly. The number should be set to the high-
est number during initial setup and reduced to the point of reliable operation that takes 
into account change in gate resistance through out the year. The options are 0-32.

 

P3 is setting secondary leaf force

Note: this parameter will only show if Dip Switch 

2 is UP. 

The lower the number the easier the gate will reverse directions when it meets 

resistance. This number may have to be changed to a higher setting if your gate is ob-
structing unexpectedly. The number should be set to the highest number during initial 
setup and reduced to the point of reliable operation that takes into account change in gate 
resistance through out the year. The options are 0-32.

 

P4 is setting a delay between leafs

 

if you have overlapping gates or a gate lock.  

Note: this parameter will only display if DIP Switch 2 is UP. 

The motor wired into the 

primary terminals (1) open first if there is a delay and closes second. It is recommended 
to have a delay of 3 seconds to avoid any jamming issues between leafs.

 

P5 is release time for the gate lock. 

Note: this parameter will only display if DIP 

Switch 3 is UP and professional board is installed. 

This option determines the length of 

time 12VDC will be sent out of terminals E_LOCK. The options are 1-4 seconds.

 

P6 is delay for automatic re-close from the open position. 

Note: this parameter 

will only display if DIP Switch 1 is UP. 

This option needs to be turned on using the 

dip switch on the board. The options are 0-99 seconds. 

23. Program remote transmitters to the board. Press/
release the learn button. Learn LED will illuminate.

24. Press/hold a button on a remote transmitter until the learn
LED flashes.

Repeat step 24 with other buttons on the remote or buttons on 
other remotes. 

NOTES ABOUT REMOTES: 

You can program up to 400 codes into the receiver. This could mean 1 button on 
400 different remotes or this could mean all 4 buttons on 100 remotes or anything 
in between. Some choose to program all 4 buttons to a single receiver if they are 
not using multiple gates to eliminate pressing the incorrect button on the remote. 
To do so follow the programming above with each button of the remote. You can 
erase all programmed codes by holding Learn 1 until the Learn LED comes ON 
and then turns OFF. 

25. The gate opener is now installed and operational via remote transmitter. Please
review the troubleshooting / control board overview
section following this page for more information on your gate opener. Also review
this area for more information on optional accessory
installation.

Содержание E-S Allegiant Series

Страница 1: ...f Installation and Operation Manual Estate Swing brand gate openers are a Sequoia Brands Inc product Please visit www estateswing com for manual updates and other product information This gate opener...

Страница 2: ...arging Control 16 16 16 650lbs 650lbs 650lbs Notes 1 When laying electrical cables use appropriate rigid and or flexible tube 2 Do not run any wires in the same conduit as110 AC power that may be in t...

Страница 3: ...ock Washer Washer Nut Control box with control board Battery Harness wire with two loose ends for you to attach to battery connectors not included Charge controller Transformer with spade connectors f...

Страница 4: ...direct burial low voltage wire Needed for wired accessories the transformer to the control box the solar panel to the control box 4 3 8 Carriage Bolts Lock Washers and Nuts This is for attaching your...

Страница 5: ...your gate in towards the property The majority of installations are pull to open PUSH TO OPEN This operation is commonly used if your driveway slopes up after the gate preventing it from swinging in T...

Страница 6: ...e on the post or column The only location of importance is the boomerang bracket that the gate opener attaches to matches the setback on this page 5 Use the setback for the degree you are trying to op...

Страница 7: ...ang bracket template for trimming Trim the boomerang bracket to match the template 2 Place the boomerang template on the other corner of the setback template Pivot the boomerang bracket template to th...

Страница 8: ...ang bracket through hole of the L shape using a 3 8 drill bit 6 Insert the 3 8 bolt and secure the boom erang in place after checking once again it is positioned to match the setback using a lock wash...

Страница 9: ...k washers washers and nuts Recheck the open position at this point it is adjusta ble by the length of the oblong holes After the location is confirmed drill a 1 4 hole through the center hole of the g...

Страница 10: ...a high moisture area apply petroleum jelly on to the terminal block to protect from moisture Running wire under the driveway Needed Narrow shovel water pipe no more that 5 in length you would need a t...

Страница 11: ...ave the factory installed jumper between the terminals PHOTO and GND installed If using a photo eye it is best to leave the jumper installed until after programming is finished and accessories are bei...

Страница 12: ...the battery atop the battery lifts 16 Connect the charging controls to the battery See below for connection details Transformer Charge board Transformer can be located up to 200 feet from the battery...

Страница 13: ...ly close at full speed Once closed the programming is complete For SINGLE GATE Push to Open 17 Remove sticker on end of the arm Press release the SET button P1 will show on the display Press release D...

Страница 14: ...automatically close at full speed Once closed the For DUAL GATE Push to Open 17 Remove sticker on end of the arm Press release the SET button P1 will show on the display Press Add to select PC for pu...

Страница 15: ...t if there is a delay and closes second It is recommended to have a delay of 3 seconds to avoid any jamming issues between leafs P5 is release time for the gate lock Note this parameter will only disp...

Отзывы: