background image

Eskridge, Inc. Olathe, Ks. 913-782-1238                                                                                                                                    www.eskridgeinc.

com

Model 312 spindle-shaft service manual, SM312S2

-AA

 

Page 5

4) 

If equipped with metal-face-type seal 

(16D)

, the adapter 

(16F)

 

with o-ring seal 

(16E)

 may be left on if this was not leaking.  

If you suspect leaks of this component, remove the adapter 

(16F)

 by using a thin chisel to begin moving it up from the seat-

ed position and remove as it clears the seal diameter boss of 
the shaft 

(2)

.  Remove and replace the o-ring 

(16E)

.  Re-install 

the adapter (16F) with lubricated o-ring 

(16E)

 in place.

6) 

Lubricate inner lip of new shaft se

al 

(16A) 

(if equipped) and 

slide it onto the shaft 

(2)

 until it fits snugly over the shaft seal 

diameter with the open side toward the insi

de of the gear drive.  

If equipped with metal-face-type seal 

(16D)

, insert each half 

of the seal in its respective cavity with lapped metal face fac-
ing the proper direction (lapped metal faces are to be touching 
each other for proper operation).

Note: Press bearing cone onto output shaft by pressing on in-
ner race only. DO NOT press on roller cage, as it will damage 
bearing.

6) 

Inspect inner and outer bearing cups 

(20D & 20B)

. If 

cups are 

damaged, drive them out using a brass drift and press new 
cups into place using an acceptable press tool that will not 
damage the cups 

(20B, 20D)

.

Base Reassembly

1) 

Clean all foreign material from any magnetic oil plug 

(30B)

 lo-

cated on base 

(1)

.

2) Place 

spindle-shaft 

(2)

 spline-end up on work table.  Using a 

press tool that presses only on the cone race, press outer bear-
ing cone 

(20A)

 onto shaft 

(2)

 until it seats against the shoulder.

3) Place 

b

ase 

(1)

 exterio

r side up on work table.

4) 

Apply a layer of lithium or general purpose bearing grease to 
the roller contact surface of o

uter bearing cup 

(20B

)

.  Install the 

rubber dirt boot 

(16C)

 onto base if equipped.

5) 

Place the shaft 

(2)

 with lip-seal 

(16A)

 if equipped and bearing 

cone 

(20A)

 on press work table (spline pointing up).  Apply a 

thin layer of purple Loctite (545) or equivalent on OD of lip-seal 

(16A)

 if equipped.

6)  Place the base 

(1)

 with the metal-face-type seal 

(16D)

 if 

equipped over the sha

ft 

(2)

 with the bearing 

(20A)

 and seal 

(16A) 

or

 (16D, 16E, 16F)

.  Use 4-5 spacers between the spin-

dle flange and lip seal 

(16A)

 to force the seal into the bore of 

the base 

(1)

.  Press on the base 

(1)

 to install the lip seal 

(16A)

.

7)  Apply lithium or general purpose bearing grease to roll-

er contact surface of the inner cu

(20D)

 then press 

inner bearing cone 

(20C)

 onto shaft 

(2)

 until it seats against 

inner bearing cup 

(20D)

.

 

8) 

T

he bearing preload should be adjusted to 

achieve rolling torque in the range  of   between 
100 to 400 in-lb. The bearing preload should be 
tailored to your application; a low-speed application may 
require a high pre-load, while high-speed applications 
usually requires low pre-load. Adding shims 

(35A)

 will in-

crease the pre-load on the bearing set. Determine your 
pre-load requirement and install shims  

(35A)

 to obtain 

this pre-load.

 

Install the Load-N-Lock™ segments 

(35B)

 over the shims 

(35A)

 and into the groove in the shaft 

(2)

. Finally, install the 

lock ring 

(35C)

 over the segments 

(35B)

.

All subassembly service or repairs should be complete at 
this time. Continue to Unit Assembly to complete unit build-
up.

Unit Reassembly

1) Install 

t

he secondary carrier 

(5)

 assembly onto the output 

shaft 

(2)

; align the splines of the carrier 

(5A)

 with the out-

put shaft 

(2)

 splines and slide the carrier onto the shaft.

2) Lubricate 

o-ring 

(16B)

 and install on the external pilot of 

the secondary ring gear 

(12B)

.

Caution: Hold ring gear(s) by outside diameter or use lifting 
device to prevent injury.

3) 

Align gear teeth of secondary ring gear 

(12B)

 with the gear 

teeth of the planet gears 

(5B)

 and  then align bolt holes 

(also use the scribe-mark made during disassembly).

4) Lubricate 

o-ring 

(16B)

 and install on the external pilot of 

the primary ring gear 

(12A)

.

5) 

Install the sun gear 

(6)

 into the mesh of the secondary car-

rier assembly 

(5)

 and install the thrust washer 

(14B)

.

6) 

Align the planet gear 

(7B)

 teeth with the teeth of the prima-

ry ring gear 

(12A)

 and install the carrier, aligning the spline 

teeth of the carrier with the splines of the sun gear 

(6)

.

7) 

Install the thrust washer (14B) onto the primary carrier as-
sembly 

(7)

.

8) 

Install the input gear 

(

4

)

.

6) 

Install the thrust washer 

(

14A

)

.

 

Refer to exploded view for 

details..

7) 

Noting the scribed line made during disassembly, (with lu-
bricated o-ring 

(16B)

 in place) align and install the cover 

(

3)

.

8) 

Install and torque the twenty 5/8-11 hex-head cap-
screws 

(25A)

 with lockwashers 

(25G)

. The torque for the 

cap-screws: 

220 ft-lb dry, 170 f

t-lb if the fasteners are 

lubricated

.

9) 

Using a splin

ed shaft to drive the input gear 

(4) 

ensure that 

the unit spins freely.

10)  Install all plugs 

(30A, 30B, 30C)

.  Fill the unit to the prop-

er level, as specified, with recommended gear oil (refer to 
chart, page 3) after unit is sealed with brake and/or motor.

The gearbox is now ready to use.

Содержание 312

Страница 1: ...ifting procedures wear adequate clothing and wear hearing eye and respiratory protection NOTE Individual customer specifications mounting case output shaft brake assembly etc may vary from exploded drawing and standard part numbers shown If applicable refer to customer drawing for details MODEL 312 SPINDLE SHAFT PLANETARY GEAR DRIVE SERVICE MANUAL ...

Страница 2: ... Model 312 spindle shaft service manual SM312S2 AA Page 1 30A 3 16B 14A 25A 25G 4 14B 7C 7E 7G 7D 7G 7B 7F 7A 12A 14B 16B 6 5C 5E 5D 5G 5B 5E 5F 5A 12B 16B 35C 35B 35A 20C 20D 1 30B 30C 20B 20A 16A 2 7E 16C 16D 16E 16F CAT SEAL LIP SEAL COMPONENT COMPONENTS ...

Страница 3: ...5 004 1232 A SAE A COVER B SAE B COVER D SAE D COVER 2 1 25 004 4052L S1 OUTPUT SHAFT SPINDLE 25 004 1692 25 004 1602 25 004 1632 25 004 1622 25 004 1712 25 004 1732 25 004 1762 INPUT GEAR 14T 12 24 SPLINE INPUT GEAR 13T 8 16 SPLINE THRUST WASHER PRI PLANET THRUST WASHER SEC PLANET RATIO I T E M Q T Y GREASE FITTING OPTIONAL 01 215 0040 PLUG 1 4 NPT PART NUMBER 20 25 1 4 3125 1 4 6957 1 26 34 1 5 ...

Страница 4: ...al consideration The max operating temp must not be exceeded under any circumstances regardless of ambient temperature If your unit was specified shaft up or with a Z option a grease zerk was provided in the base housing For shaft up operation the output bearing will not run in oil and must be grease lubricated Use a lithium based or general purpose bearing grease sparingly every 50 operating hour...

Страница 5: ... refer to exploded view to confirm spacer positions d Begin placing rollers 7D pri 5D sec around shaft 7C pri 5C sec There should be clearance for last roller to slide in Be sure to install 12 pri or 2 rows of 18 sec rollers in each planet gear 7B pri 5B sec on loose roller applications If using multiple rows of rollers repeat steps C and D as necessary Once complete refer to exploded view to conf...

Страница 6: ...aring grease to roll er contact surface of the inner cup 20D then press inner bearing cone 20C onto shaft 2 until it seats against inner bearing cup 20D 8 The bearing preload should be adjusted to achieve rolling torque in the range of between 100 to 400 in lb The bearing preload should be tailored to your application a low speed application may require a high pre load while high speed application...

Отзывы: