
i-XL Service Guide
27
Put a hard, flat material on top of the belt
splice.
Add some heavy weight.
Wait minimum 2 hours for the adhesive to
harden.
Remove the load and the tape.
If necessary, sand the top of the adhesive
until the surface is smooth and flat.
Pay special attention to the edges.
Ensure the belt edges are smooth and
without sharp edges.
Содержание Kongsberg XL
Страница 13: ...i XL Service Guide 13 4 FlexiHead with i Cut I Cut camera 5 MultiCut with i Cut I Cut camera ...
Страница 40: ...i XL Service Guide 40 14 3 Two vacuum pumps optional 14 3 1 General 14 3 2 3 sections 14 3 3 4 sections ...
Страница 50: ...i XL Service Guide 50 Pull the string to move the cables into the traverse ...
Страница 51: ...i XL Service Guide 51 20 3 Rear side of traverse assembly View nearest to X2 end of traverse ...
Страница 52: ...i XL Service Guide 52 View nearest to X1 end of traverse ...
Страница 53: ...i XL Service Guide 53 20 4 Feeder clamp X1 assembly 20 5 Feeder clamp X2 assembly ...
Страница 59: ...i XL Service Guide 59 Assemble the cables in a nice way beneath the top frame ...